1 / 18

Southeast Maricopa / Northern Pinal County Transportation Study

Southeast Maricopa / Northern Pinal County Transportation Study. TRC Presentation January 30, 2003. Regional Context. Study Focus Area. Population & Employment Growth. 2002 Network. Lanes. 2002 Network Summary. Maricopa County. Pinal County. Future Base. 385 miles of new arterial

anais
Download Presentation

Southeast Maricopa / Northern Pinal County Transportation Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southeast Maricopa / Northern Pinal County Transportation Study TRC Presentation January 30, 2003

  2. Regional Context

  3. Study Focus Area

  4. Population & Employment Growth

  5. 2002 Network Lanes

  6. 2002 Network Summary Maricopa County Pinal County

  7. Future Base • 385 miles of new arterial • 22 miles of new freeway • Cost = $1,155 million • 586 miles of widened arterials • Cost = $2,637 million

  8. Future Base Network Summary Maricopa County Pinal County

  9. New or Improved Interchange W i d e n t o 4 L a n e s W i d e n t o 6 L a n e s W i d e n t o 8 L a n e s a n d H O V Enhanced Facilities • 42 miles of freeway widening • Cost = $336 million • 35 miles of highway widening • Cost = $123 million • New or reconstructed TI’s • Cost = $106 million • 38 miles of HOV lanes • Cost = $228 million

  10. Enhanced Network Summary Maricopa County Pinal County

  11. New Facilities • Projected Daily Volume – • 35,000 to 65,000 • Cost = $117 million • Projected Daily Volume – 60,000 to 100,000 • Cost = $790 million • Projected Daily Volume – • 96,000 to 140,000 • Cost = $390 million • Projected Daily Volume – • 64,000 to 110,000 • Cost = $1,390 million • Projected Daily Volume – 46,000 to 110,000 • Cost = $1,640 million Note: Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.

  12. New Facilities Network Summary Maricopa County Pinal County

  13. Operational Comparisons Maricopa County Pinal County

  14. Proposed Regional Connections

  15. Local Network & Rural Transit Access

  16. Light Rail/Bus Rapid Transit: Union Pacific Chandler Branch Chandler Blvd. Main Street Power Study Corridors • Commuter Rail: • UP Southeast

  17. Draft Network

  18. High Capacity Corridor Cost • UP Mainline Chandler - $226 to $530 million • Chandler Boulevard - $306 to $684 million • Main Street – $185 to $374 million • Power Road - $237 to $465 million • UP Southeast - $567 million • TOTAL - $1.5 to $2.6 billion

More Related