An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Devizes RFC Floodlights and Grounds Improvement Project Summer 2013

  2. Contents • Pictures to demonstrate our plans • Permanent Floodlights • Car Park Upgrade • General Pitch Maintenance • Pitch-side Drainage and Walkway • Pitch-side Safety Fencing • Pitch-side Dug Outs • Enhanced Spectator Viewing Facilities • Upgrade Training Area Lights

  3. Permanent Floodlights – Top Pitch 8 permanent floodlights will be installed on this pitch fully funded by a Wiltshire County Council Section 106 grant

  4. Car Park Improvements – Funded by DRFC Our car park on a typical match day Our Current car park. The area marked in red will be replaced by hard standing and the remainder of the area re-dressed all using 100% recycled material from a local (less than a mile away) project.

  5. General Pitch Maintenance We will Shockwave Aerate, de-compact, re-seed, weed supress and Hollow Bore treat our 2 pitches and training area. DRFC will pick up the full cost of this work.

  6. Pitch-side Drainage and Walkway This area directly adjacent to our Club house has serious drainage issues (the red line shows where the touchline should be!) This will be dug out, proper drainage installed and an artificial 3G grass walkway installed.

  7. Pitch-side Safety Fencing We plan to install a safety fence along the red line to encompass the entire pitch (see Ground Plan Drawing for more detail) to match the fence already in place on the far side of the pitch.

  8. Pitch-side Dug Outs Two Dug-Outs on hard standing concrete to be installed on the far touchline.

  9. Enhanced Spectator Viewing Facilities The top will be removed from the retaining wall and a split level patio installed to give additional standing room for spectators. This will be bounded along the red line by the pitch-side safety fence described above.

  10. Upgrade Training Area Lights Heads to be upgraded to brighter lights We currently have 8 permanent ‘training’ lights situated on our training area, the light is of poor quality (very yellow) we plan to upgrade these running a power spur from the new electric supply that is already being installed for the main floodlights

  11. Summary – DRFC Lights and Grounds Improvement Plan Wiltshire Police HQ Cricket Pitch New Flood Lights Tennis Courts Club House Upgrade Existing Training Lights New Fence Spectator Area Walkway 2 Dug Outs Existing Fence Resurface existing Car Park New Car Park