Caterpillar ECF-2 Program. Test Criteria Test Matrix Results. Caterpillar ECF-2 Test Criteria. 500 hour – Steady State Test Cycle. Test Pass/Fail Criteria: No Loss of Oil Consumption Control No stuck rings/Loss of ring side clearance No Liner Scuffing or Bore Polish
E N D
Caterpillar ECF-2 Program • Test Criteria • Test Matrix • Results
Caterpillar ECF-2 Test Criteria 500 hour – Steady State Test Cycle • Test Pass/Fail Criteria: • No Loss of Oil Consumption Control • No stuck rings/Loss of ring side clearance • No Liner Scuffing or Bore Polish • No Loss of Blowby Control • Measured Piston Deposits • EOT Oil Quality to be monitored
Caterpillar ECF-2 Test Matrix * Test started at hot temp for first 100-150 hrs, then switched to Low Temp
Caterpillar ECF-2 Test Results Summary • Discrimination? • Temperature sensitivity to deposits validated • Field concerns validated • Test conditions defined • Low Reference Oil (Ref 1) selected • High reference being sought • Onus on Oil/Additive Industry to supply
Caterpillar ECF-2 Test Summary • Completing 4 more tests (2 high, 2 low Ref Oils) • Expected completion May 15, need extended time • Propose go forward with C13 test for CI-4 Plus • Taskforce Approval needed • ASTM / EMA agreement needed • Research Report and Test Procedure to be documented
Caterpillar ECF-2 Test Matrix Plan All Tests to be conducted at the same low temp conditions
Caterpillar ECF-2 Test Matrix Test completed 400 hrs Test completed 175 hrs Test completed 175 hrs