1 / 12

Happy Creek Sediment TMDL

Happy Creek Sediment TMDL. Technical Advisory Committee Meeting Gene Yagow July 23, 2014. Happy Creek Modeling Sub-watersheds. All Forest Load Multiplier (AllForX). Existing Condition. All Forest Condition. Existing Load All Forest Load. AllForX =.

Download Presentation

Happy Creek Sediment TMDL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Happy Creek Sediment TMDL Technical Advisory Committee Meeting Gene Yagow July 23, 2014

  2. Happy Creek Modeling Sub-watersheds

  3. All Forest Load Multiplier (AllForX) Existing Condition All Forest Condition Existing Load All Forest Load AllForX =

  4. Happy Creek Monitoring and Loads

  5. Final Selection of Comparison Watersheds

  6. Happy Creek AllForX Regression B C A Happy Creek B = AllForX value used for the TMDL; AC = the 80% Confidence Interval (shown in green); TMDL = AllForXB x All-forest load; MOS = (AllForXB – AllForXA) x All-forest load.

  7. Basic Criteria used for Selecting Comparison Watersheds • DEQ biomonitoring stations within 30 miles of Happy Creek • Average VSCI > 60 • Minimum VSCI > 55 • Minimum of 3 VSCI samples • Sampled since January 2005 • 2nd to 4th order streams • Only one comparison watershed per stream

  8. Sediment Load Calculation

  9. Allocation Scenarios

  10. Next Steps • Incorporate Happy Creek Sediment TMDL into a combined Shenandoah Tributaries TMDL Report • Hold the final Public Meeting • 30-day comment period • Address public and EPA comments to finalize the TMDL

  11. Questions? Gene Yagow Virginia Tech Biological Systems Engineering Dept. Email: eyagow@vt.edu Phone: 540-231-2538 ftp://bsesrv214.bse.vt.edu/Yagow/ShenandoahTribs/