1 / 4

Equipment Life

www.hinesmanagementservices.com. Equipment Life. The hidden costs of operating expenses: Capital Expenditures. 23 years = ASHRAE standard life expectancy of centrifugal chillers 35+ years = Hines-maintained chiller life.

andra
Download Presentation

Equipment Life

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. www.hinesmanagementservices.com Equipment Life

  2. The hidden costs of operating expenses: Capital Expenditures 23 years = ASHRAE standard life expectancy of centrifugal chillers 35+ years = Hines-maintained chiller life. This represents $1,200,000chiller replacement cost deferred for 12 years. (*) (*) $1,000/ton replacement cost; based on a 400,000-sq-ft building

  3. “Hines maintains properties at a measurably higher level than the industry. Why? Because it is a good business decision that increases value. Their success starts with design, adds well trained operators and invokes a discipline that ensures consistency. Result: A property remains in near-new condition. “We at I. A. Naman + Associates, Inc. use Hines properties as a reference, especially with our new people, as to how operation and maintenance should be performed.” Charles E. Durrett, P. E. Executive Vice President I. A. Naman + Associates, Inc.

  4. www.hinesmanagementservices.com 050905

More Related