SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
E N D
SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT
This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399-0450. All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner. Title VI and Title VIII Compliance
Agenda •Exhibit Review • www.CFLROADS.com • Slide Show Presentation • One-on-One Questions and Answers • Comment Cards
Current Status • Pre-Design Phase • Gathering Information • Existing Right-Of-Way is Not Defined • Working Closely With City of Cocoa Beach • City Council Voted to Support Project
Segment 1 Proposed 8-ft Sidewalk on the East Side of the Northbound Travel Lanes From South 16th Street to South 1st Street
Segment 1: Proposed Improvements • Proposed Swales From Edge of Pavement to Front of Sidewalk • No Right-Of-Way Acquisition • Locate Existing Right-of-Way (Right-Of-Way Mapping) • Existing Right-of-Way Will Need to be Cleared • Parking • Landscaping
Segment 1: Existing Right-Of-Way Parking Landscaping
Segment 2 Replace Existing 8-ft Asphalt Path on the East Side of the Roadway From Orlando Avenue to Wakulla Lane
Segment 2: Proposed Improvements • Maintain Existing Drainage • Adjustment of Existing Inlets within Existing Asphalt Path • No Right-Of-Way Acquisition
Maintenance of Traffic • Lane Closures will be Restricted to Night Time Hours • Maximize Activity During Day Light Hours •Existing Speed Limits Shall be Maintained During Construction •Maintain Property Access During Construction
Tentative Project Schedule • Survey and Design Begin – Fall 2011 • Public Information Workshop – Spring 2012 •Final Plans – Spring 2013 •Advertising for Construction – Summer 2013 • Begin Construction – Fall 2013
Comment Card Please turn in tonight or mail in by July 27th. The mailing address is on the form.
Contact Information Derek Dixon FDOT, District 5 719 S. Woodland Blvd Deland, Fl 32720 Office (386) 943-5547 Derek.Dixon@dot.state.fl.us Jeremy Dilmore, P.E. FDOT, District 5 719 S. Woodland Blvd Deland, Fl 32720 Office (386) 943-5544 Jeremy.Dilmore@dot.state.fl.us