1 / 6

DTP 7 th meeting – Bern 12-14 September 2011

DTP 7 th meeting – Bern 12-14 September 2011. Update on the preparation of Validation Phase 2 (feasibility of the new test procedure with the WLTC) Alessandro.Marotta@jrc.ec.europa.eu. Roles and responsibilities. VTF - NEXT STEP

anitra
Download Presentation

DTP 7 th meeting – Bern 12-14 September 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DTP 7th meeting – Bern 12-14 September 2011 Update on the preparation of Validation Phase 2 (feasibility of the new test procedure with the WLTC) Alessandro.Marotta@jrc.ec.europa.eu

  2. Roles and responsibilities

  3. VTF - NEXT STEP • Collect the Parameter List from the DTP subgroups by the end of this week (16 September) • Get a revised version of excel template for results submission (H. Steven) • Propose a Test Sequence for Validation Phase 2 (Ichikawa-san/ Celine) • Members of the VTF will contact the respective laboratories to discuss about the Parameter List , Test Sequence, excel template • Feedback from these discussions will be communicated to DTP subgroups (and, if needed, DTP subgroup will be asked to integrate/clarify the Parameter List) before the end of September • By end of September / beginning October, the draft Validation Phase 2 detailed plan and draft Technical Guidelines will be distributed to DTP/DHC members and to participating labs.

  4. VTF - NEXT STEP (less urgent) • Test matrix • Vehicle selection • Assessment criteria

More Related