90 likes | 216 Views
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher. May 18, 2005 Washington DC. Streamlining Verification MTAC Workgroup 93. Mission Statement:
E N D
MTAC Workgroup 93 Streamlining VerificationDebbie CooperBob Galaher May 18, 2005 Washington DC
Streamlining VerificationMTAC Workgroup 93 • Mission Statement: • Collectively determine how the USPS and the Industry can leverage existing, or guide future, technological solutions into the mailing life cycle that can enhance the verification and induction process. • Workgroup Lifecycle – May 2005 through Quarter I, 2006 • Three Task Teams (Subgroups): • Vision Team • Barcode Team • Concept Design & Test
Streamlining VerificationMTAC Workgroup 93 • Vision Team (Sept. 2005) • David Steinhardt, Pritha Mehra • Barcode Team (Oct. 2005) • Mury Salls, Jeff Freeman • Concept Design & Test (March 2006) • Debbie Cooper, Robert Galaher
Concept Design & Testing • Goal • Define processes for automated verification for Standard and Periodical mailers utilizing mail asset barcodes (pallets/handling units). • Execute a proof of concept for automated verification with pallet barcodes. • Status – Goal achieved Concept Works! – Current systems can fundamentally support a streamlined mailing acceptance/induction process
Concept Design & Testing • Design, • Leverage USPS systems for verification/payment, scheduling, and induction (PostalOne!, FAST and Surface Visibility) • Identity – Unique mail asset identifiers (barcode Mailer placard on pallets) • Verification/Payment – PostalOne! - pallet id links postage statement / appointment id links pallet id • Scheduling – FAST; pallet id tied to appointments • Induction – e8125; pallet id sent to SV for scanning at entry point
Shippers Schedule Appointments FAST PostalOne!® Shipper Enters Mail Mailer Submits Electronic Docs & Postage Payments Mailer Submits Postage Payments USPS Scans Shipment Surface Visibility Data USPS/Customer Electronic Access Verification and Acceptance Postage Stmnt Postage Stmnt Qualification Reports Quality and Performance Reports Shipping Reports Shipment Reports BMC Washington DC 20499 STD FLTS BC WKG Washington DC 200 Qualification Reports Quality and Performance Reports Shipment Reports Shipping Reports Payment Verification Measurement Induction Scheduling Concept Design & Testing Scheduling Appointments Tracked e8125s Presort reports Processes Information Induction Events Postage payments
Concept Design & Testing • Test, and Results • Three mailers at Three USPS Facilities • Concept works! – Successes: • Data exchange (information sharing) • Electronic 8125 (container specific) • Entry appointments, containers and postage statements linked (verification/payment) • Scan device supports business process • Initial visibility reports
Concept Design & Testing • Test and Results • Challenges (being addressed) • Technical aspects • Low scan rates • Data normalization and conformance • Business aspects • Reports require enhancements • Roles and access • Contingencies
Next Steps • Recommend Sunset MTAC 93 Workgroup • Design and Concept Testing Final Report • MTAC Group leadership determination • Pilot test group • Next test cycle this summer • Pre-Induction event reporting • Appointment updates to SV • Segregation of paper vs. electronic 8125 loads to SV • Post-Induction event reporting • Shipment discrepancies and resolution actions • Container discount vs. correct entry • Mail irregularity reporting (SV to PostalOne!)