DESIR Progress Report DESIR hall details defined for civil construction:

DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS room in production building first transmission tests of RFQ RF system successful tested detailed optical study of HRS

anneke
Download Presentation

DESIR Progress Report DESIR hall details defined for civil construction:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DESIR Progress Report • DESIR hall details defined for civil construction: • - compressed air, liquid nitrogen, cooling water, etc • detailed layout of RFQ-HRS room in production building • first transmission tests of RFQ • RF system successful tested • detailed optical study of HRS • S3 – DESIR beam line is established • work on safety at DESIR started • DESIR web pages online (www.cenbg.in2p3.fr/desir) EURORIB meeting, 10 June 2008

  2. S3 SPIRAL2 layout N F S S R I Accelerator Level 0 15 m DESIR Level -1 Spiral and GANIL Production building

  3. Production building F. Varenne

  4. S3 Connections to DESIR Level 0 15 m DESIR Level -1 Spiral and GANIL

  5. 8m Legend: Electronics Quadrupole Sextupole Multipole Dipole 12m RFQ and HRS cave HRS RFQ storage and maintenance

  6. Length = 70 cm Radius = 3mm The High Intensity RFQ Cooler SHIRaC

  7. Test bench at LPC-Caen (Oct 07/ Jan 08) • Current tests are done with ionization source • Imax ~ 50 nA

  8. Simulation First Part: • Code developments including RF fields, microscopic approach for cooling, space charge • Input beam : 133Cs+ beam • Emittance : 75π.mm.mrad • Energy : 20keV • Intensity : 1µA • Cooling distance at 0.05mbar ~ 400mm • Output emittance < 1π.mm.mrad • Injection efficiency ~ 25 % • Acceptance ~ 35 π.mm.mrad Second Part: • Two cooling sections with different r0-radius • 5 mm and 3 mm + 4mm junction • Same RF on the two sections • Better injection efficiency (~ 100%) • Acceptance ~ 75 π.mm.mrad • Same cooling effect • Same emittance • Better overall efficiency

  9. DN160 Flange Electrodes Ø7 Insulator 2 SHV Micrometric screw 2µm RF breakdown (Jan 08/Mar 08) • 2 electrodes face to face • RF amplitude • Helium pressure • Gap • Roughness Working pressure • No RF breakdown : • For Etching polishing under 3600Vpp and 15Pa • For Ra 1.6 under 3400Vpp and 12.5Pa

  10. Beam transmission (Jun 08) • Cooler in RF-only : 10 % for 23Na+ and 133Cs+ • Transmission vs RF voltage for 133Cs+ :

  11. SHIRaC Modification (Sep 08) • Additional pump • Low pressure at injection and extraction electrodes • Gaz injection • Emittance measurement  more details on the poster of F. Duval

  12. DESIR HRS 3 x’s, 3 y’s, 3 ’s, 3 ’s, 1 mass, 1 energy 3 p mm mrad, 50 keV Mass resolution: M/DM = 20000

  13. COSY INFINITY: X and Y projections 3 p mm mrad, 50 keV R = 22091

  14. DESIR HRS: Simulations First and fifth order mass separation for 1/20000 mass difference Initial and final beam envelops

  15. DESIR HRS: misalignments tests  more details on the poster of T. Kurtukian Nieto 0.2 mm shift of multipole: significant loss in mass resolution

  16. General purpose LN2 Control room Gas & waste storage IS TAS off-line source 1 Collinear Laser spectroscopy b-NMR off-line source 2 Penning trap + Decay setup MLL trap Double MOT RFQ bun- cher Paul trap DAQ room General purpose Neutron ditch Electronics Desk Access Laser room (mezzanine) DESIR layout 17/04/08 Identification station with tape Beam from S3 LUMIERE Level 0 BESTIOL Level -1 Beam from Production building Kitchen (on top of CR) Level -1 Crane access to basement Meeting room (on top of DAQ) 5 m Beam from SPIRAL1

  17. Supply Assembly Room 3 Gray Room 2 Electri- city Stor- age 1 Stor- age 2 Gray Room 1 Assembly Room 1 Assembly Room 2 free free free Work- shop Control Racks Inter- faces HV supplies Crane access to basement 5 m Neutron ditch DESIR Level -1 Limits DESIR hall

More Related