120 likes | 256 Views
PENINGKATAN PENGENDALIAN PROSES BISNIS UNTUK MENCAPAI WORLD CLASS SERVICES. RAKOR TW-IV 2013, LAMPUNG 8-10 JANUARI 2014. E L E C T R I C I T Y F O R A B E T T E R L I F E. PRODUKSI BERDASARKAN TIPE BAHAN BAKAR (FUEL-MIX). HPP : 1.138,- Rp/KWH. HPP : 1.209,- Rp/KWH. HPP : 1.112,- Rp/KWH.
E N D
PENINGKATAN PENGENDALIAN PROSES BISNIS UNTUK MENCAPAI WORLD CLASS SERVICES RAKOR TW-IV 2013, LAMPUNG 8-10 JANUARI 2014 E L E C T R I C I T Y F O R A B E T T E R L I F E
PRODUKSI BERDASARKAN TIPE BAHAN BAKAR (FUEL-MIX) HPP : 1.138,- Rp/KWH HPP : 1.209,- Rp/KWH HPP : 1.112,- Rp/KWH PLTD Payoselincah OFF Mulai 1 April 2014 HPP : 1.047,- Rp/KWH
OVERALL EFFECTIVENESS EQUIPMENT 87,4% EFOR
0 Analisa Pareto Lost OutputPLTD/G Sektor Jambi Periode Semester 1 2013(Januari - Juni) Periode Semester 1 2013(Januari - Juni) Lost Output Sektor Jambi (Tidak termasuk Sewa) Reasons for Force DeratedPLTD&G 0,11 Total Potensi PLTD&G 441,12 56.2 FO &FD PLTG BH 2 Temp.Oil header High 30,9 (51,1%) Crack 1st Stage nozzle and Temp.Spread TRIP Total 11,96 FO &FD PLTD 15,9 (20 %) High temperarture exhaust Oli Leackeg in Pipe SOGAV Fault Total FO & FD PLTG BH 1 11,40 (19,1 %) * Note: Gap yang berwarna Kuning telah diselesaikan TemperatureSpread Trip(3x) Total
0 Analisa Pareto Lost OutputPLTD/G Sektor Jambi Periode Semester 1 2013(Januari - Juni) Periode Semester 2 2013 (Juli- Desember) Lost Output Sektor Jambi (Tidak termasuk Sewa) Lost Output Sektor Jambi (Tidak termasuk Sewa) Total Potensi PLTD&G 441,12 404,8 Total Potensi PLTD&G 56.2 9,1 FO &FD PLTG BH 2 FD&FO PLTG BH 2 30,9 (51,1%) 1,4 3,8 FO &FD PLTD 15,9 (20 %) FD & FO PLTD FO & FD PLTG BH 1 11,40 (19,1 %) 3,9 FD&FO PLTG BH 1 *Angka dalam satuan GWH
89,61% OVERALL EFFECTIVENESS EQUIPMENT 2014 Strategi : 1. Mengurangi waktu masa pemeliharan periodik 2. Penggantian Filter Online
PROGRAM PENDUKUNG 2014 PROGRAM (PENDUKUNG) TW-1 2014 PT.PLN (Persero) Sektor Pembangkitan Jambi GUDANG ONLINE ® Sistim Informasi Gudang DATABASE (SERVER) IMAP – MAXIMO™ OLIFE ® DASHBOARD Sistim Informasi Outage Manegement dan lifetime hot section gas turbine. Computerize maintenence management system. E-LOGSHEET ®DASHBOARD EFFICIENCY® DASHBOARD E-LOGSHEET ® FORM Sistim Informasi Heat rate dan Efficiency PembangkitPLTG Informasi data operasi dan pengusahaan pembangkit Formulir data operasi
WORKPLAN Aktivitassesuaijadwal Rencana 2014 Aktivitas proyek selesai