1 / 5

Time Meeting Mar 25, 2014

Time Meeting Mar 25, 2014. Agenda Safety Schedule Machine and system reports. Safety and training. Ed Lessard. Schedule. NRO started running today (03/25), will finish up on 03/29. BLIP is running 200 MeV, at 100 uA due to polarimeter work. RHIC declared physics from fill # 18046

ansel
Download Presentation

Time Meeting Mar 25, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time MeetingMar 25, 2014 Agenda • Safety • Schedule • Machine and system reports Time Meeting, Run 14

  2. Safety and training • Ed Lessard Time Meeting, Run 14

  3. Schedule NRO started running today (03/25), will finish up on 03/29. BLIP is running 200 MeV, at 100 uA due to polarimeter work. RHIC declared physics from fill # 18046 Maintenance (03/19) day worked on AGS D5 IPM, elens, CeC, 56 MHz. First APEX session scheduled on 03/26, PHENIX cooling water fix in parallel. Time Meeting, Run 14

  4. Machine and system reports • RHICGuillaume Robert-Demolaize • STAROlga Evdokimov • PHENIX Klaus Dehmelt • AGSHaixin Huang • BLIP Suzanne Smith • Operations Peter Ingrassia Time Meeting, Run 14

  5. Next Time Meeting • Next Time Meeting: Tuesday, April. 01 1:30PM, Snyder Time Meeting, Run 14

More Related