1 / 4

Open discussion: a) moving toward finalization of the ET conceptual design

We need to progress step by step the mirror mass (~150 kg) the material of the bulk (silicon) The fiber material (silicon crystal thin rods/ aluminum /niobium) Coating material choice Coating procedure (standard vs no standard) Optical performances ( total absorption)

anson
Download Presentation

Open discussion: a) moving toward finalization of the ET conceptual design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. We need to progress step by step • the mirror mass (~150 kg) • the material of the bulk (silicon) • The fiber material (silicon crystal thin rods/ aluminum /niobium) • Coating material choice • Coating procedure (standard vs no standard) • Optical performances ( total absorption) • Heat load and working Temperature • Geometry of the last stage suspension • Control strategy and related noise issue • Actuators and local sensing • Upper suspension geometry • Thermal issues along the chain and at the payload interface • Newtonian coupling including the effect at the interface of the last stage Open discussion:a) moving toward finalization of the ET conceptual design

  2. The agenda of the WG2 session in Erice • Main topics • -Suspension upper part • - suspension lower part • - bulk properties • - coating properties • - actuator sensors • - cooling issues • …………………………………

  3. Setting up a calendar for the next meetings The paradigm: we call for meetings in anticoincidence with LVC ( ~ 1month of itme window) Date • November 2009 • February 2010 • April/May 2010 • July 2010 • November 2010 • February 2011 • April/May 2011 • July 2011 • November 2011

  4. Finding the location for new meetings • Jena, Germany • Glasgow, Scotland (?) • Trento/Padova, Italy (?) • Hannover , Germany (?) • CERN, Switzerland (???) /Giessen, (Germany) (???) • Nikhef, Netherland (?) • Lyon, (France) (?) • Napoli, (Italy) (?) • XXXXXXXXXXXXXXXX

More Related