An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AFC Schedule Review CM25 Collaboration Meeting November 2009 RAL

  2. AFC Status • Current schedule confirmed at meeting 8th October • Design to accommodate absorber fittings and fix related issues progressing • Superconductor in hand • Bobbin material in hand • Cryocoolers due soon

  3. Schedule Milestones • Milestones and cost profile integrated into main project plan • Tesla Engineering schedule modified to correct where they think they have been optimistic e.g. winding, delivery