30 likes | 168 Views
AFC Schedule Review. CM25 Collaboration Meeting November 2009 RAL. AFC Status. Current schedule confirmed at meeting 8 th October Design to accommodate absorber fittings and fix related issues progressing Superconductor in hand Bobbin material in hand Cryocoolers due soon.
E N D
AFC Schedule Review CM25 Collaboration Meeting November 2009 RAL
AFC Status • Current schedule confirmed at meeting 8th October • Design to accommodate absorber fittings and fix related issues progressing • Superconductor in hand • Bobbin material in hand • Cryocoolers due soon
Schedule Milestones • Milestones and cost profile integrated into main project plan • Tesla Engineering schedule modified to correct where they think they have been optimistic e.g. winding, delivery