1 / 8

WRAP Final Project

WRAP Final Project. Final Cut: week of ____ FINAL EVALUATION and BURN: week of ____. STEPS TO COMPLETEION :. 1. Complete project in Director as a MacroMedia Projector movie (see “Using Director,” “Chapter Eight”) 2. Save projector in a shared folder separate from Director 6.5

apria
Download Presentation

WRAP Final Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WRAP Final Project Final Cut: week of ____ FINAL EVALUATION and BURN: week of ____

  2. STEPS TO COMPLETEION: 1. Complete project in Director as a MacroMedia Projector movie (see “Using Director,” “Chapter Eight”) 2. Save projector in a shared folder separate from Director 6.5 3. Mr Shafer copies projector to DOF2 and plays the movie.

  3. GRADING CRITERIA 3 POINTS EACH Text Background Self graphic Sound Effects Music over Special Graphics Video Animation Credits Copy Write Use Authorization - Documented

  4. CREDITS INCLUDES: • People on the team and what they did. • Separate listing of software used. • ‘Special Thanks’ for authorized use of copy write materials • SEPARATE Produced by CMAT and Company TEXT

  5. FINAL EVALUATION Counts as one TEST grade for this six weeks Counts as 75% of FINAL EXAM which is 1/4 Semester Grade Your grade for this six weeks is almost entirely derived from your project grade. Essay = remaining 25% of Final Exam.

  6. FINAL EXAM WILL BE GRADED ON: 75% FINAL PRODUCT 25% ESSAY (on Job Assignment)

  7. Thursday/Friday 5/16, 17 • Project saved as a MacroMedia Projector in a sharedfolder outside “Director” • MEMO in my hands with the folder location and file name (if the file will not transport or play on another computer maximum Final Project grade can not exceed 85.)

  8. BURN (write CDs) Schedule • Follows evaluation of ALL teams in EACH Division • Includes only those teams having met ALL requirements • One copy distributed to each team member present at time of burn • Sequenced: Team A, B, C, D

More Related