1 / 42

Company Introduction

Bestec E&C Co., Ltd. Company Introduction. Application for Participation. 1. Greetings. 2. Company Overview. 3. Business Fields. 4. Licenses and Certificates. 5. Equipments and Facilities. 6. Business Performances. Major Clients. 8. 7. Map. 9. Contents. Dear Sirs,

april
Download Presentation

Company Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bestec E&C Co., Ltd. Company Introduction

  2. Application for Participation 1 Greetings 2 Company Overview 3 Business Fields 4 Licenses and Certificates 5 Equipments and Facilities 6 Business Performances Major Clients 8 7 Map 9 Contents

  3. Dear Sirs, • We wish to participate in the project to be carried out by your esteemed company and hereby submit our Application for Participation. • Your careful consideration shall be greatly appreciated. • DATE--------- • Lee Jeong Gook • CEO 1. Application for Participation Headquarter: 102-809, Digital Empire II 486, Sin-dong, Yeongtong-gu, Suwon City, Gyeonggi-do Phone: 031-695-7557 FAX : 031-695-7559 Paju Branch : 471-3, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do Phone: 070-8250-3702~3 FAX : 031-942-4272

  4. 2. Greetings Bestec E&C is an integrated engineering company full of creative wisdom and challenging spirits in the fields of machinery facility construction and electronic construction for electronic, semi-conductor, LCD, OLED, bio, pharmaceutical, power plants, and petro-chemical industries to cover whole range from the early phase for clean room facilities, utilities system, electronic works, and automatic control to design, procurement, construction and following-up control. We always put top priority on customers’ satisfaction through our best performance. Thanks to our long experience on sites, we know what to do and how to do for the customers by our “Cost Down, High Quality, Safety, Delivery, BestA/S” Our basic corporate policy lies in creation, passion, and trust. We give our words that we will always do our best to accompany our customers for healthy growth. Thank you very much. Lee Jeong Gook/CEO Bestec E&C Co., Ltd.

  5. Introduction ■Name of the Company: Bestec E&C Co., Ltd. ■Represented by: Lee Jeong Gook ■ Established on: April 21, 2008 ■ Paid-in Capital: ₩800,000,000 ■ Major Business:Semi-conductor, LCD, Display, Industrial Plants, Clean Room Utilities System, Design for Electronic and Automatic Control Battery Drying Room andAging Room, Dehydrating works Water Humidifying Facilities, Leakage Detection System UPS, InstantVoltage Drop and Power Failure Compensation works VOC Scrubber and Solvent Collection Facilities Sales of Air Shower and Uninterruptible Products (PLATE, PC,ACRYLIC,PVC) LCDprotect film, Tray Products Sales of Pipes, Electric Components, Water Saver, Bus Duct? Industrial Boiler, Sales of Ultrasonic Flow meter ■ Headquarter:102-809, Digital Empire II 486, Sin-dong, Yeongtong-gu, Suwon City, Gyeonggi-do TEL : 031 - 695 - 7557,FAX : 031 - 695 – 7559 ■ Paju Branch:471-3, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do TEL : 070 - 8250 - 3702~3 , FAX : 031 - 942 – 4272 ■ Homepage:www.bestecenc.com 3. Company Outlook

  6. Brief History ■ 2008 April - Established (Pain-in Capital W400,000,000) June -License of machinery construction - Member of Korea Mech. Const. Contractors Association -Member of Mutual Aid Society of Korea Mech. Const. Contractors Association -Partner Company of HydisTechnology July -Partner Company of SERVEONE November -Partner Company of DONGWOO FINE-CHEM -Partner Company of LG Display -Capital increase up to W400,000,000 -License of electric construction December - Member of Korea Electrical Contractors Association ■ 2009 January -ISO 9001 Certificates February -Capital increase up to W500,000,000 -Dealer of Uninterruptible (PLATE, PC, ACRYLIC, PVC, Aluminum Alloy) Products for Korea Plate April - Established Paju Branch - Partner Company of LGINNOTEC 3. Company Outlook

  7. 3. Company Outlook Brief History ■ 2009 June -Partner Company of ILJIN Display - Venture Company Certificate July - Dealer of KOSDO October - Capital increase up to W800,000,000 ■ 2010 May -Partner Company of ILJIN June - Partner Company of SK Corporation (Innovation, Energy, Synthetic Chemistry) September - Partner Company of SK Construction November - Dealer of ㈜LS Cable(BUS Duct? andCable) ■ 2011 May - Partner Company of Oriental Brewery June - Partner Company of ILJIN diamond - Certificate of Innovative Small-and-Medium-Sized Company

  8. 3. Company Outlook Organization Chart CEO Vice President Management Team Facility Team Electricity Team Technical Marketing Team Resource Marketing Team Maintenance Human Resources Finance Accounting Design Site Control Quality Control Safety Control Design Site Control Quality Control Safety Control Electric, Semi-conductor, LCD Pharmaceutical Bio, Clean Room, Battery Drying Room Aging Room Dehydrator, VOC Scrubber, Water Hydrating Facilities, Water/Thermal Power Plants, Petrochemical Plants UHP Fitting, Bellows V/V SUS316L BA, EP Regulator Teflon Tube Generator, UPS DVC, Cable, Panel, Bus-Duct

  9. ICR(Industrial Clean Room) 4. Business Fields • - Clean Room in the semi-conductor plants • - Clean Room in LCD,OLED,PDP plants • - Extremely sensitive machinery industries • - Utility System Design & Construction • Clean Room Electric Design & Construction • Battery Drying Room, Aging Room and Dehydrator

  10. BCR(Bio Clean Room) 4. Business Fields - Pharmaceutical product industries - Food industries - Hospitals (Operation room, Sterile room, ICU) and related sectors - BCR Electric Design & Construction - Utility System Design & Construction

  11. 4. Business Fields Water Hydration Before After W.S.H(Using Water in the Clean Room Steam Hydration (using Steam in the Clean Room) From all-time steam hydration To direct water spraying hydration in the Clean Room Effects 1. Less burden for steaming 2. Less burden for cooling dry coils 3. Less CO2 Features

  12. - Power plants, Petrochemical, Gas processingplants - VOC Scrubbers - Semiconductor, LCD andPortable Scrubbers - Design and construction of cold storages - Design and construction of automatic plant controlling system - DI Utility System Design & Construction - BuildingUtility System Design & Construction - PlantUtility System Design & Construction Others 4. Business Fields

  13. Clean Room Power Facilities • - Clean Room IlluminationDesign & Construction • - Power Panel Design & Construction • - Mcc panel Design & Construction • Design & Construction for Extension and Repair • Illumination Facilities • - Design & Construction for Illumination • - Industrial/Residential/Specialty Illumination • - Usual Illumination • - Solar Illumination Electric Construction Works 4. Business Fields

  14. 4. Business Fields Electric Construction Works Power Facilities in Plants - Substation facility works - Automatic control facilities, leakage detectors - Construction works for electricity transmission, transformation, distribution, and lines - Enlargement works - Installation of automatic control (PLC works) electric panel - Installation of Bus Ducts - Remodeling and maintenance of transformers and substation facilities Electric Installation in Public Facilities - Electric installation works for shopping centers, buildings, apartments, residential houses - Electric installation works for hotels and hospitals - Electric installation works for officetles, churches, public agencies - Electric installation works for offices - Electricity design and construction of intelligent buildings

  15. 4. Business Fields Electric Construction Works • Electric Installation in Industrial Plants • - Electric installation works for petrochemical plants • - Electric installation works for hydro/nuclear power plants • - Electric installation works for wastewater treatment facilities • - Electric installation works for water treatment facilities • Installation of Automatic Control Systems • - Electric installation works for automatic control system in wastewater treatment facilities • - Electric installation works for automatic control system in oil refinery/chemical plants • - Electric installation works for automatic control system in power plants • - Electric installation works for automatic control systemin Di system • - Electric installation works for Inverter, plc

  16. 4. Business Fields Installation of Automatic Control Systems System Installation (Controlling System) • Industry automation system(PLC, HMI and industrial communication sectors of Profibus, LonWorks) • Motion Control System (Automation concepts for CNC Controllers, Invertors, Motors, Rockwell DRIVE, and Transfer lines) • Standard invertors andIndustrial motors and High pressure motors and Invertors) • Process automation(Field Instrumentation, Analyzing equipments, DCS Application) • *** Industry Automation Consulting and Construction *** • Process screening and control • Power screening system • Water treatment system • Security • Building screening system • Illumination control system • Integrated production management system • Construction of information system of SCADA, MIS, EIS, CIM

  17. 4. Business Fields Installation of Automatic Control Systems Power Transmission and Transformation/ Electricity Control • Electric Accident Analysis Systems • - Transient Fault Recorder Power System Dynamics Monitor • Electric system automatic screening and remote controlling system • - PC-Based Remote Control System • - SCADA System • Test Equipments • - Portable converter testing equipments • - Portable transformer testers • - Auxiliary relay testers • ESCO-related Systems • - Multi-functional integrated power management system • - Maximum power demand screening/controlling system • Integrated Power Supply/Demand System

  18. 4. Business Fields LASER Processing and Installation of Clean Booth and Air Shower • - LASER Processing Capacity : 0.1t~16t • - Manufacturing of precision sheet metal products and covers • - Manufacturing of machinerycovers • - Manufacturing of components for semi-conductor and LCD production lines • - Manufacturing of clean room transport equipments • Manufacturing and installation of Clean Booth • Manufacturing and installation of Air Shower

  19. 4. Business Fields Sales of Pipes/Electric Parts • - UHP Fitting, Lok Fitting • - Bellows V/V, Diaphragm • - Regulator, Clean Ball Valve • - UHP Gauge, Transmitter • - Gas Filter, Multi-Housing Filter • - SUS 316L BA, EP Tube, Pipe • - Teflon Tube, PFA Fitting, Valve • - Generator, UPS, AVR, Panel, Cable, • MCCB • - InstantVoltage Drop/Power Failure Compensation Equipments (DVC,SP) • Bus-Duct • - Ultrasonic flowmeter

  20. 4. Business Fields Thanks to our patent technology “No-Power Vacuum Creation”, this product allows less water volume and high pressure. By inducing pressure difference at water supply, it creates vacuum so that it absorbs air pressure to mix it with water and move to injection holes, which blasts the water due to the air inside it. Users admire the feature of less water with high pressure. [Basin Type] [Shower handle – Sitting Type] [Show handle – Standing Type]

  21. Quality Throughout inspection on materials and installation Stable supply of utility Continuous quality improvement Cost Minimum initial investment costs Energy saving Least operation costs Intensive Management Delivery Due EPC Works Daily Report Quick A/S Safety Observation of Safety Principles ZERO Accident Throughout Treatment of Wastes Clean Sites 4. Business Fields Competitive Edge of the Company

  22. 5. Licenses and Certificates

  23. 5. Licenses and Certificates

  24. 5. Licenses and Certificates

  25. 6. Equipments and Facilities

  26. 6. Equipments and Facilities

  27. 6. Equipments and Facilities

  28. 6. Equipments and Facilities

  29. 7. Major Clients LG Display LG Innotec SMD SB LiMotive SSLM Oriental Brewery innovation energy gloval chemical ILJIN dislpay ILJIN diamond

  30. 8. Business Performances • Customer: SAMSUNGSBLI MOTIVE • Location: Giheung, Gyeonggi-do • Project Period: 2009.04 ~ 2009.06 • Project Name: Illumination and heating works for SBLI Motive Dry Room at SAMSUNGGIHEUNG R&D CENTER(Clean RoomCLASS 0.3µM 1,000) • Customer: SERVEONE • Location: Paju City, Gyeonggi-do • Project Period: 2010.02 ~ 2010.07 • Project Name: Manufacturing and installation of AIR SHOWER at LG Innotechin Paju (Clean RoomCLASS 0.3µM 1,000) • Project Period: 2010.02 ~ 2010.07 • Project Name: Manufacturing and installation of 3rd Phase equipments at LG Innotech in Paju • Customer: GSNEOTEC • Location: Incheon City • Project Period: 2010.02 ~ 2010.02 • Project Name: Construction of Ara Waterway in Gyeong-in Canal

  31. 8. Business Performances • Customer: ILJIN Display • Location: Eumseong-gun, Chungcheongbuk-do • Project Period: 2010.02 ~ 2010.08 • Project Name:Improvement and repair works for low voltage boards at the Electricity Room • Process transformation works at Thermal Treat Room and Cleaning Room • Turn-key works for Clean Room EPC Turn-Key (Embedded equipments, installation equipments, electric works) (CLASS 1,000 , 0.3µM) • EXHAUSE Line piping works in the CLEAN ROOM • Utility works in the CLEAN ROOM (Electricity, Air, DI, Drain piping) • Relocation of CMP process • Piping works for cooling water and air of CMP process • Relocation of CMP, DMP process • Installation works of CMP main cables • Project Period: 2011.01 ~ 2011.02 • Project Name: Lay-out works for thermal treatment process • Project Period: 2011.09 ~ 2011.09 • Project Name: Replacement of LBS controlling box and High pressure board FAN

  32. 8. Business Performances • Customer: HydisTechnology • Location: Icheon City, Gyeonggi-do • Project Period: 2010.09 ~ 2010.11 • Project Name: Water humidifier installation works at Hydis • Customer: SK Innovation • Location: Yuseong-gu, Daejeon City • Project Period: 2011.01 ~ 2011.02 • Project Name: Installation of High TemperatureAging Room & Automation Facilities • Project Period: 2011.05 ~ 2011.05 • Project Name: Installation of High TemperatureAging Room & Automation Facilities • Customer: Oriental Brewery • Location: Icheon City, Gyeonggi-do • Project Period: 2011.05 ~ 2011.06 • Project Name: Replacement of air conditioning facilities for the Clean Room at Icheon Factory

  33. 8. Business Performances • Customer: DONGWOO FINE-CHEM • Location: Pyeongtaek City, Gyeonggi-do • Project Period: 2011.06 ~ 2011.09 • Project Name: Manufacturing and installation of 3W 4000A AL-FEIP42 FEEDER and others (bus ducts) • Customer: SSLM • Location: Dalseong-gun, Daegu City • Project Period: 2011.07 ~ 2011.12 • Project Name : Manufacturing and installation of 3W 4000A AL-ALIP54 FEEDER and others (bus duct) • Customer: ILJIN diamond • Location: Eumseong-gun, Chungcheongbuk-do • Project Period: 2011.08 ~ 2011.09 • Project Name: Replacement and piping works for water cooling facilities in Factory 1

  34. 8. Business Performances • Customer:LG Display • Location: P7,P8 in Paju City, Gyeonggi-do • Project Period: 2009.01 ~ 2009.03 • Project Name: Toxic Exhaustion Duct Chamber Drain at P7 • 4 works including installation of homoiothermic cables • Cold/hot water supply piping for heat pumps in P7 • Installation of flexible • Installation of R&D Room and Lab on 6F of Annex M • Layout modification of controlling boards of the integrated warehouses • Improvement of exhaustion of smoking rooms on 1F,4F,5F of Annex M • Project Period: 2009.04 ~ 2009. 06 • Project Name: P7 TFT Coater VCD Pump Hook-up P7 TFT ULVAC Sputter Dry Pump Hook-up Installation of CR emergency drain facilities in P7/P8 Hook-up works for TFT eyeball cleaner in P7 Addition of ADP TDET Chamber in P7 • Project Period: 2009.07 ~ 2009.08 • Project Name: Alteration of FPHT Oven Exhaust in P7 • Installation of PFC exhaust back-up ducts in P7 • Power supply works for TFT Glass Edge Crack tester in P7 • Piping works for CR spray-type humidifying facilities in P7 • Removal works of C/R Coater general exhaust pipes in P7 Addition of Block Repair Shop UT on B2F in P7

  35. 8. Business Performances • Customer:LG Display • Location: Paju City, Gyeonggi-do • Project Period: 2009.08 ~ 2009.12 • Project Name: New chamber for Paju Test Team on 2F of Annex M • Hook-up electricity works • Hook-up works to install depressurizers on 2F of Annex M • Hook-up and configuration works for UV division orientation equipments on 6F of Annex M • Hook-up works for Lab of R&D Center on 6F of Annex M • Hook-up works of wrapping machines for warehouse on 3F of Annex M • Removal of organic drain pipes on 5F of Annex M • Hook-up works of translucent IPS equipment N2 for R&D Center of Annex M • Project Period: 2009.08 ~ 2009.10 • Project Name: System upgrades for waste heat collection in Paju Factory • Project Period: 2009.08 ~ 2009.08 • Project Name: Environmental facility works for PajuLG AP2 DI SYSTEM (Piping works) • Project Period: 2009.10 ~ 2010.02 • Project Name: Manufacturing and installation of P8E P-GAS DUCT

  36. 8. Business Performances • Customer:LG Display • Location: Paju City, Gyeonggi-do • Project Period: 2010.10 ~ 2010.11 • Project Name: Installation of P8 TFLI #0318 Steam Macro UT Footrest for pipe reinforcing • Hook-up works of high temperature Ch. Exhaust for Reliability Lab of Annex M in Paju • Hook-up works of UT for additional Gate Strip equipment HPMJ in P7 • Installation of pipes to drain condensation water from C/R toxic exhaustducts in P7 • Removal of unused CDA pipes of Unit 1 for outside packaging on 4F of Annex M in Paju • Project Period: 2010.10 ~ 2010.12 • Project Name: Replacement of FRP Fan Impeller in Paju Factory • Replacement of OAC Check Damper in P7 • Project Period: 2010.10 ~ 2010.10 • Project Name : Vacuum separation works of POL Panel Replanter/POL Absorption stage of Annex M in Paju • Project Period: 2010.11 ~ 2010.11 • Project Name : Hook-up works to install CF CP(Unit No. 16) andRobot in P7 • Construction of CR at P7 CF CP(Unit No.16) in Paju(ACP) • Installation of P8E TWED#01 at lower ACP in Paju (ACP) • Project Period: 2010.11 ~ 2010.12 • Project Name : UT Hook-up works of High TemperatureOven andC/F Oven for R&D Center on 6F of Annex M in Paju • Installation of P8E TFT PHT,CVD,SPT,STR equipmentsat lower • Configuration works to accommodate G2 Slit Coater at R&D Center on 6F of Annex M in Paju

  37. 8. Business Performances • Customer:LG Display • Location: Paju City, Gyeonggi-do • Project Period: 2011.01 ~ 2011.05 • Project Name: Digitization of production exhaust in Paju Factory (Installation) • Installation of AP2E2 AGV Line FFU and relocation of florescent lamps (Electricity) • Project Period: 2011.01 ~ 2011.01 • Project Name: Expansion of CR for #512 PCB extension in CR on 5F of Annex M in Paju • Project Period: 2011.01 ~ 2011.02 • Project Name: Installation of UT to provide Manual Thinner to P8E+ No.5 • Hook-up works for exhaust drain for AP2 CELL Material Combination Room in Paju • Improvement works for water humidifying process in P7 • Installation of CDA at Panel Electro-Optics Test Room on 6F of Annex M in Paju • Installation of power outlets for ADJ PC Rack at P8 SDI Line #03 • Relocation of test equipments in idle areas of P8 TFT • Project Period: 2011.01 ~ 2011.03 • Project Name: Removal and installation of SDI Line #03 ACP for relocation of P8 INKJET • Configuration works of He Lines for AP2 TFT Ion Doping Leak Check in Paju • Installation of P83 CELL Gap Line #1,#2 at lower ACP (ACP) • Project Period: 2011.01 ~ 2011.04 • Project Name: Installation of P82 CR1F Cell Material Storage Room (ACP)

  38. 8. Business Performances • Customer:LG Display ㈜ • Location: Paju City, Gyeonggi-do • Project Period: 2011.04 ~ 2011.06 • Project Name: Removal of ACT and installation of doors at P7 TFT lothographerflow lines • Additional works to reuse P82 CDA condensation water • Installation of upper skirts for P7 FSPT#2 • Project Period: 2011.05 ~ 2011.05 • Project Name: Installation of H-Beam for maintenance of DI in Paju • Installation of iron stairs at PajuDI HERO Cleaning Tank • Urgent removal and reinstallation of P7 TFT 1F TSPT#17~TWET#03 ACP • Project Period: 2011.05 ~ 2011.06 • Project Name: Installation of H-Beam for maintenance of P8 DI • Configuration upgrading works according to addition of replanting functions on P8 CRPR01 (ACP) • Installation of ring blowers in P7 TFT Ph.2 Lift C/V • Installation of drain ports in relation to leakage from P81 FPHT#01 PRB exhaust pipes • UT H/U for new product analysis equipments in Lab on 6F of Annex M • Urgent connection works of WET#5,7 of AP2 TFT Photo Team in Paju • Installation of additional vacuum lines for distortion in P81 C/F Oven Robot GLS • Additional urgent hook-up works for P83 TSPT#2 Ar Gas • Urgent works for UT for additional equipments of E2-1 Line Face Seal in Paju • Additional CO2 piping works for WET#5,7 of AP2 TFT Photo Team in Paju • Additional works for P83 TSPT02 Ar Gas (Urgent)

  39. 8. Business Performances • Customer:LG Display ㈜ • Location: Paju City, Gyeonggi-do • Project Period: 2011.07 ~ 2011.10 • Project Name: Correction works on P7 TCVD#1,2 ACP Doors (ACP) • Project Period: 2011.07 ~ 2011.11 • Project Name: Replacement of hinges of PajuAP2 EastACP Doors (ACP) • P82 CF Zone lowerACP and zinc finishing works (ACP) • Project Period: 2011.08 ~ 2011.08 • Project Name: Removal and reinstallation of hatch rack for equipment accommodation in P8 Factory • Project Period: 2011.08 ~ 2011.09 • Project Name: Installation of H-Beam for maintenance of DI in Paju • Additional installation of CDA on Line 501 on 5F of Annex M in Paju • UT works in relation to modification of Beam Lines for AP2 TFT ELA crystalization equipments in Paju • CDA Hook-up to supply AP2 DE #5 Ionizing A/K in Paju • CR configuration works to accommodate Fluid injection a-equipments in R&D Center on 6F of Annex M in Paju • Project Period: 2011.08 ~ 2011.10 • Project Name: CR configuration works to accommodate Fluid injection a-equipments on 6F of Annex M in Paju • Project Period: 2011.08 ~ 2011.11 • Project Name: Installation of P83 TCVD #3,5,6 power outlets • Installation of ACP between P82 RB#1,2 Line Un-Loader Ports • Installation of ACP between P82 PI#1 Line Un-Loader Ports

  40. 9. Map Headquarter

  41. 9. Map Paju Branch 473-1, Geumseung-ri, Tanhyeon-myeon, Paju City, Gyeonggi-do Phone: 070-8250-3720 FAX : 031-942-4272 파주 지사 : 경기도 파주시 탄현면 금승리 471-3번지 TEL:070-8250-3702 FAX:031-942-4272

  42. Bestec E&C Co., Ltd. Thank you..!

More Related