An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TTA′s Transposing PlanMar 15 2011 Elly (Eunkyo) Kim Assistant Manager, TTA vekimv@tta.or.kr

  2. 1. Introduction2. TTA Standardization Procedure3. Transposition Schedule4. Other Issues on transposition

  3. 1. Introduction • TTA (Telecommunication Technology Association) • Domestic Standardization Activities • Industrial ICT standard establishment • Coordination between industrial requirement and government policies • Proposal of National Standard (KICS) • Global Standardization Activities • 3GPP/3GPP2 Organizational Members • Activities on IEEE, ITU(R/T/D), AWG, WRC, and so on • CJK(China-Japan-Korea) standardization cooperation

  4. 1. Introduction (cont′d) • Organization Chart for Standardization Committees

  5. 2. TTA Standardization Procedure Done • Approval Process • 1st : Project Group (PG) • 2nd : Technical Committee(TC) • 3rd : Coordination Committee(CC) • 4th : Technical Assembly(TA) • Meeting interval (General) • PG: several times a year • TC: four times a year • CC: four times a year • TA: twice a year (Jun, Dec) • Current status of IEEE 802.16m adoption • D11 review has been done • Preparation of the draft standard To go

  6. 3. Transposition Schedule • Tentative Plan • In order to meet ITU-R schedule, it is necessary to freeze TTA draft standard by mid of May.

  7. 4. Other Issues on Transposition • Confirmation of 802.16m Draft version to adopt • Is D12 the final version? • What if it is disapproved by the RevCom? • What is the future plan of IEEE in this case? • Official standard publish for IEEE 802.16m • According to MoU between TTA and IEEE-SA, the official standard number & standard document is necessary to adopt IEEE standard. • Next WATO meeting • Needs to be held before WirelessMAN-Advanced is revised.

  8. Thank You