Workpackage 8 Integrated test bed and related experimental activities

Plenary Meeting Munich WP8 Status Overview June 13 , 200 5. Workpackage 8 Integrated test bed and related experimental activities. Carlo Cavazzoni. WP8 Objectives.

aquila
Download Presentation

Workpackage 8 Integrated test bed and related experimental activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plenary Meeting Munich WP8 Status Overview June13, 2005 Workpackage 8 Integrated test bed and related experimental activities Carlo Cavazzoni

  2. WP8 Objectives • To integrate in laboratory test beds equipment, subsystems and emulators realised in other WPs and leveraging existing test bed(s) previously developed • To realise integrated experiments on the advanced functionalities defined, specified and developed in the other WPs (e.g. intra- and inter-domain ASON/GMPLS advanced functionalities including also transmission aspects, multi-layer resilience strategies in a multi-domain environment, management and control, multi/service nodes, etc.) • To study the feasibility of an integrated field trial for example interconnecting (already existing, or under development) test beds with the NOBEL test bed.

  3. WP8 Deliverables & Activities A8.3 - Feasibility study of a field trial D7 - Feasibility analysis of an integrated field trial D22 - Preliminary integration and experimental results A8.1 - Equipment, subsystems and emulators integration M8 M12 M18 M24 A8.2 - Experiments’ realization D14 - Identification and design of test bed experiments D35 - Final Test bed integration

  4. D22 “Preliminary integration and experimental results”- TOC 1 INTRODUCTION 2 UPDATE ON TEST BED INTEGRATION 3 PRELIMINARY EXPERIMENTAL RESULTS 3.1 Experimental performance of GMPLS Provisioning on all-optical ring-based MAN for SLA verification [CTTC] 3.2 Experimental performance of key optical components [CTTC] 3.3 Traffic measurements [ACREO] 3.4 Evaluation of the APRZ modulation format high-speed transmission [ACREO] 3.5 Failure management and alarm control and their implication in the protection and restoration schemes [TID] 3.6 Dynamic connectivity in a transparent ASON domain [TILAB] 3.7 Experimental performance of multilayer interworking and multilayer resilience [SIEMENS] 4 CONCLUSIONS

  5. Tuesday 10.30-14.30 Room R10.376 Tuesday 15.00-16.30 Room R10.376 WP8 Meeting proposed agenda • D22 discussion • Overview of the document • Comments on Chapters 2 and 3 • Update D22’s calendar • Action points until the delivery of D22 • Next experimental activities & deliverable D35 • Planning of experiments for each test bed • Roadmap for D35 preparation • Other issues Monday 13.00-18.30 Room 2