50 likes | 248 Views
Plenary Meeting Munich WP8 Status Overview June 13 , 200 5. Workpackage 8 Integrated test bed and related experimental activities. Carlo Cavazzoni. WP8 Objectives.
E N D
Plenary Meeting Munich WP8 Status Overview June13, 2005 Workpackage 8 Integrated test bed and related experimental activities Carlo Cavazzoni
WP8 Objectives • To integrate in laboratory test beds equipment, subsystems and emulators realised in other WPs and leveraging existing test bed(s) previously developed • To realise integrated experiments on the advanced functionalities defined, specified and developed in the other WPs (e.g. intra- and inter-domain ASON/GMPLS advanced functionalities including also transmission aspects, multi-layer resilience strategies in a multi-domain environment, management and control, multi/service nodes, etc.) • To study the feasibility of an integrated field trial for example interconnecting (already existing, or under development) test beds with the NOBEL test bed.
WP8 Deliverables & Activities A8.3 - Feasibility study of a field trial D7 - Feasibility analysis of an integrated field trial D22 - Preliminary integration and experimental results A8.1 - Equipment, subsystems and emulators integration M8 M12 M18 M24 A8.2 - Experiments’ realization D14 - Identification and design of test bed experiments D35 - Final Test bed integration
D22 “Preliminary integration and experimental results”- TOC 1 INTRODUCTION 2 UPDATE ON TEST BED INTEGRATION 3 PRELIMINARY EXPERIMENTAL RESULTS 3.1 Experimental performance of GMPLS Provisioning on all-optical ring-based MAN for SLA verification [CTTC] 3.2 Experimental performance of key optical components [CTTC] 3.3 Traffic measurements [ACREO] 3.4 Evaluation of the APRZ modulation format high-speed transmission [ACREO] 3.5 Failure management and alarm control and their implication in the protection and restoration schemes [TID] 3.6 Dynamic connectivity in a transparent ASON domain [TILAB] 3.7 Experimental performance of multilayer interworking and multilayer resilience [SIEMENS] 4 CONCLUSIONS
Tuesday 10.30-14.30 Room R10.376 Tuesday 15.00-16.30 Room R10.376 WP8 Meeting proposed agenda • D22 discussion • Overview of the document • Comments on Chapters 2 and 3 • Update D22’s calendar • Action points until the delivery of D22 • Next experimental activities & deliverable D35 • Planning of experiments for each test bed • Roadmap for D35 preparation • Other issues Monday 13.00-18.30 Room 2