1 / 17

15th CAA Cross-Calibration Workshop /17-19 April 2012 University College of London

15th CAA Cross-Calibration Workshop /17-19 April 2012 University College of London. STAFF Report. 1. Status of data delivery:. a. STAFF-SA. 1. Status of data delivery:. a. STAFF-SA. 1. Status of data delivery:. b. STAFF-SC: NBR and HBR mode. 2. Delivery plan:. 3. Status of data pipeline:.

ardith
Download Presentation

15th CAA Cross-Calibration Workshop /17-19 April 2012 University College of London

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 15th CAA Cross-Calibration Workshop /17-19 April 2012UniversityCollege of London STAFF Report

  2. 1. Status of data delivery: a. STAFF-SA 15th Cross-Calibration Workshop / 17-19 April 2012

  3. 1. Status of data delivery: a. STAFF-SA 15th Cross-Calibration Workshop / 17-19 April 2012

  4. 1. Status of data delivery: b. STAFF-SC: NBR and HBR mode 15th Cross-Calibration Workshop / 17-19 April 2012

  5. 2. Delivery plan: 15th Cross-Calibration Workshop / 17-19 April 2012

  6. 3. Status of data pipeline: • SA: • Data pipelines are operational. • SC: • DWF pipeline was rebuild in order to add new elements needed by CWF data. • CS pipeline need to be updated according to the new calibration table. → All these data will be reproduced and delivered to CAA for the complete mission period. • CWF pipeline is close to be completed. It is ready for ISR2 but it needs a patch to produce in the same time data in ISR2 and GSE. This pipeline was delayed due to the comparison between FGM and STAFF, in order to validate the new calibration process. 15th Cross-Calibration Workshop / 17-19 April 2012

  7. VTL2.rff CWF.cef Validation tool SpectroCWF.ps (XYZ) =~76h30 Validation tool ~2 min for NBR ~3 min for HBR ~15 h for NBR ~60 h for HBR ~2 min for NBR ~3 min for HBR =~1h30 WFL1.rff VTL1.rff ~30 min for NBR ~50 min for HBR ~20 min for NBR ~50 min for HBR CSL2.rff =~2h45 CS.cef DWF.cef Time given for one month for 4 satellites with one CPU. ~2 min for NBR ~3 min for HBR 15th Cross-Calibration Workshop / 17-19 April 2012

  8. 4. STAFF-FGM Cross-Calibration: a. The old calibration • Fit of Bx and By components in spinning system by a sine signal at spin frequency give estimate of Bperp files and phase angle f • Amplitude assumed to be constant during the window sampling 20 sec • BDC sample rate must be > 1 spin period b. The new calibration • Slidingwindows, givingcontinuousestimate of BDC and Bwaves • Final CWF are the sum of BDC and Bwaves • Initial sample rate preserved 40 sec 15th Cross-Calibration Workshop / 17-19 April 2012

  9. 4. STAFF-FGM Cross-Calibration: b. The new calibration Problem with the original ground calibration of the instruments, due to non circular Helmoltz coils (time degradation). → New measurements done in Chambon-la-forêt by the technical team with new Helmoltz coils lead to new calibration tables and new transfer functions. 15th Cross-Calibration Workshop / 17-19 April 2012

  10. 4. STAFF-FGM Cross-Calibration: b. One event comparison SR2 FGM: PPD 4s / STAFF Despin Software 20s <∆B⊥/B⊥> ± σB⊥/B⊥ = 21.65%±1.66% 15th Cross-Calibration Workshop / 17-19 April 2012

  11. 4. STAFF-FGM Cross-Calibration: b. One event comparison SR2 SR2 FGM: PPD 4s / STAFF: Despin Software 20s <∆B⊥/B⊥> ± σB⊥/B⊥ = 21.65%±1.66% FGM: CAA FULL / STAFF: Cont. cal. method <∆B⊥/B⊥>±σB⊥/B⊥ = 0.77%±0.84% 15th Cross-Calibration Workshop / 17-19 April 2012

  12. 4. STAFF-FGM Cross-Calibration: b. One event comparison SR2 SR2 FGM: PPD 4s / STAFF: Despin Software 20s <∆B⊥/B⊥> ± σB⊥/B⊥ = 21.65%±1.66% FGM: CAA FULL / STAFF: Cont. Cal. method <∆B⊥/B⊥>±σB⊥/B⊥ = 0.77%±0.84% 15th Cross-Calibration Workshop / 17-19 April 2012

  13. 4. STAFF-FGM Cross-Calibration: b. One event comparison SR2 • Continuous calibration workswelleven on short time scale. • ∆B⊥/B⊥ < 1% • ∆j ≃3° → understudy. 15th Cross-Calibration Workshop / 17-19 April 2012

  14. 4. STAFF-FGM Cross-Calibration: b. One event comparison SR2 Spin residue It could be removed in next update but it is still under discussion. 15th Cross-Calibration Workshop / 17-19 April 2012

  15. 4. STAFF-FGM Cross-Calibration: b. Statistical comparison 15th Cross-Calibration Workshop / 17-19 April 2012

  16. 4. STAFF-FGM Cross-Calibration: b. Statistical comparison 15th Cross-Calibration Workshop / 17-19 April 2012

  17. 5.Conclusion • Data delivery: • SA OK. • SC a little late, due to the new calibration method. • Cross calibration SC / FGM • Very good new results due to • New calibration tables • New calibration method. S/C # 2, 3 and 4 : 10% → 1% S/C # 1 : 20% → 1% • Still pending: • spin residue at 2 fs. • ∆φ≃ 3° to be confirmed. 15th Cross-Calibration Workshop / 17-19 April 2012

More Related