1 / 4

PMD - Status

PMD - Status. B. K. Nandi Variable Energy Cyclotron Centre, Kolkata. PMD - Flow Chart. Geant Hits. Sum up all the “edep” for one cell. Cell “edep” converted to “ADC”. Test Beam. Clustering. Photon/Hadron Discrimination. PMD - Checklist.

arissa
Download Presentation

PMD - Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PMD - Status B. K. Nandi Variable Energy Cyclotron Centre, Kolkata

  2. PMD - Flow Chart Geant Hits Sum up all the “edep” for one cell Cell “edep” converted to “ADC” Test Beam Clustering Photon/Hadron Discrimination B.K. Nandi, VECC, ALICE Offline Week

  3. PMD - Checklist Work Status 1. New Geometry file Done 2. Edep : MeV ADC To be done Time line – approximately a month from now 3. RAW Data Format To be done 4. Clustering Done Drawback – Takes > 15min for one event with dN/dh = 8K. To be improved B.K. Nandi, VECC, ALICE Offline Week

  4. PMD - Checklist Work Status 5. Photon/Hadron discrimination Currently we are having a very naïve algorithm. Neural Network is under development. 6. Change of coordinate system To be done 7. New IO Done B.K. Nandi, VECC, ALICE Offline Week

More Related