40 likes | 219 Views
PMD - Status. B. K. Nandi Variable Energy Cyclotron Centre, Kolkata. PMD - Flow Chart. Geant Hits. Sum up all the “edep” for one cell. Cell “edep” converted to “ADC”. Test Beam. Clustering. Photon/Hadron Discrimination. PMD - Checklist.
E N D
PMD - Status B. K. Nandi Variable Energy Cyclotron Centre, Kolkata
PMD - Flow Chart Geant Hits Sum up all the “edep” for one cell Cell “edep” converted to “ADC” Test Beam Clustering Photon/Hadron Discrimination B.K. Nandi, VECC, ALICE Offline Week
PMD - Checklist Work Status 1. New Geometry file Done 2. Edep : MeV ADC To be done Time line – approximately a month from now 3. RAW Data Format To be done 4. Clustering Done Drawback – Takes > 15min for one event with dN/dh = 8K. To be improved B.K. Nandi, VECC, ALICE Offline Week
PMD - Checklist Work Status 5. Photon/Hadron discrimination Currently we are having a very naïve algorithm. Neural Network is under development. 6. Change of coordinate system To be done 7. New IO Done B.K. Nandi, VECC, ALICE Offline Week