1 / 78

Process of a Standard’s Development Following a Standard from Inception to Publication

Process of a Standard’s Development Following a Standard from Inception to Publication. Dave Terruso Editor Kate McClung Staff Manager. Objectives. How to:. Register a work item Write a new or revise an existing standard Ballot a standard Review an edited standard Publish a standard.

arissa
Download Presentation

Process of a Standard’s Development Following a Standard from Inception to Publication

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process of a Standard’s DevelopmentFollowing a Standard fromInception to Publication

  2. Dave TerrusoEditorKate McClungStaff Manager

  3. Objectives How to: • Register a work item • Write a new or revise an existing standard • Ballot a standard • Review an edited standard • Publish a standard

  4. It All Starts With an Idea

  5. Register a Work Item

  6. Provides a tracking number, “WK5432” which can be searched on the ASTM website Alerts those on the Standards Tracking Service Stimulates participation from outside the task group Initiates the ASTM balloting process Why Register a Work Item?

  7. Work Item Registration

  8. Work Item Registration

  9. Work Item Registration

  10. Work Item Registration

  11. Work Item Registration

  12. Work Item Registration

  13. Work Item Registration

  14. Work Item Registration

  15. Work Item Registration

  16. Work Item Registration

  17. Work Item Registration

  18. Revisions Only • Register new work item to generate a request for MS WORD file of the latest version of the standard from ASTM International • E-mail sent to technical contact with a link to the current standard in MS WORD • Complete instructions are provided with the file

  19. E-mail Confirmation This is an automated alert from ASTM International.--------------------------------------------------------------------- To the submitter of Work Item WK20670 Confirmation - A New Work Item has been submitted for review. The Work Item information recorded in the database appears below. Please review the information for accuracy. When referring to the Work Item please use the identifier: WK20670 If you need to edit the item, go to: http://myastm.astm.org Subcommittee Chairman: Adelbert Vance - email: dell.vance@chevron.com Technical Contact: Paula Watkins - email: watkinsp@api.org Staff Manager: David Bradley - email: dbradley@astm.org The following information was recorded. ==================================================================== Work Item Type: Revision Revised Standard: D1250-07 - Standard Guide for Use of the Petroleum Measurement Tables Sponsoring Subcommittee: D02.02.0A Target Ballot Date: 7/2008 Target Completion Date: 3 - 6 Months 10/15/2008 to 1/15/2009 Rationale: This revision has been necessitated by the updating of the petroleum measurement tables.

  20. Write or Revisea Standard

  21. ASTM’s Form and Style Manual

  22. Download Form and Style Manual

  23. Download Form and Style Manual

  24. ASTM New Standard Template • Available at www.astm.org on Technical Committees page under the link “Key Documents and Forms” • Templates for: Test Method, Specification, Guide/Practice, Classification, Terminology • Detailed instructions are provided with template

  25. Download Template

  26. Download Template

  27. Select Template

  28. Select Template

  29. Template Features • Suggested and mandatory headings are provided; mandatory headings are in RED • Macro prompts to insert Title and Footnote 1 • Ability to insert: • Tables • Figures • Equations • Auto Numbering

  30. Screen Snap of Template

  31. Screen Snap of Template

  32. Screen Snap of Template

  33. ASTM Template Toolbar

  34. ASTM Template Toolbar

  35. ASTM Template Toolbar

  36. ASTM Template Toolbar

  37. Ballot a Standard

  38. Prepare Revision for Ballot • Always keep a clean copy of standard • Determine the sections that are going to be revised • Determine how much context is needed for a revision to make sense to the voter • Determine if entire document is to be balloted, or just sections

  39. Prepare Revision for Ballot • Always copy and paste sections to be revised into a NEW, blank MS Word document • Then turn on the Track Changes function • It is not necessary to use italicsorboldletters to show changes because Track Changes will show what is revised

  40. Prepare Revision for Ballot

  41. Submit Item for Ballot

  42. Submit Item for Ballot

  43. Submit Item for Ballot

  44. Submit Item for Ballot

  45. Submit Item for Ballot

  46. Submit Item for Ballot

  47. Submit Item for Ballot

  48. Balloting • ASTM has three levels of balloting: • Subcommittee • Main Committee • Society • Ballots are open for 30 days online • Once an item passes all levels of balloting, standard receives an approval date of either the 1st or the 15th of the month

  49. Review an Edited Standard

  50. Editing the Standard • Your Editor begins the editing process while the ballot is still open. This includes: • Typesetting/converting Word document to SGML • Scanning and placing artwork • Ensuring the standard matches balloted draft • Ensuring that tables and figures are cited and numbered correctly • Verifying titles of ASTM standards in the Referenced Documents section and verifying that they are all cited in the text

More Related