An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. design-build cm at-risk or cmgc negotiated projects Cst M 371 - Estimating II preconstruction & conceptual estimating

  2. estimating at the phases… m∙b∙e mbe assignment recap: medical center in Minneapolis, MN 11,000 sf, 500 lf of perimeter & 11’ height 10 standard adders & 3 allowances total cost = $3,280,920 other possible (though not as accurate) answers… $3,254,046 or $3,307,686 due to possible range of cost used for the exam tables…

  3. estimating at the phases… m∙b∙e mbe assignment recap: student answers… range was $2,215,425 to $3,445,594 or a variance of $1,230,169 reasons… interpolation errors (sf and/or perimeter) errors calculating adders… quantity, price & interpolation understanding data

  4. estimating at the phases… m∙b∙e mbe assignment recap: revise & resubmit due tomorrow by 2 p.m. maximum of ½ points returned

  5. estimating at the phases… m∙b∙e mbe assignment recap: another problem statement… The commander at Fairchild AFB in Spokane, WA has contacted your firm about a new Repair and Maintenance facility(…basically a garage). The facility will be CMU block with steel framing for the roof structure. The floor area is 220’x60’ with no basement with a single story wall height 16’. Also needed are a 5 hp air compressor w/ dual controls, one 5 ½ ton hoist and 15 single tier lockers.

  6. estimating at the phases… phase II: programming o∙o∙m

  7. estimating at the phases… o∙o∙m phase II: programming methodology: modified UNIFORMAT template building usage &/or typology mark-up… unknowns allowances & contingency

  8. estimating at the phases… o∙o∙m phase II: programming assignment #2: oomestimate Nez Perce tribe education, training & business development project requirements…next time

  9. estimating at the phases… o∙o∙m phase II: programming example…

  10. end of lecture #3