Cst M 371 - Estimating II

design-build cm at-risk or cmgc negotiated projects. Cst M 371 - Estimating II. preconstruction & conceptual estimating. sage advice…. How do you eat an elephant?. One bite at a time. methods, tips & tricks…. scope of work. strategy build it before you build it….

Download Presentation

Cst M 371 - Estimating II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. design-build cm at-risk or cmgc negotiated projects Cst M 371 - Estimating II preconstruction & conceptual estimating

  2. sage advice… How do you eat an elephant? One bite at a time.

  3. methods, tips & tricks… scope of work strategy build it before you build it…

  4. methods, tips & tricks… strategy

  5. start with control quantities… gross square foot (gsf) take-off exterior wall (perimeter) x height site area # of floors reliance upon duplicity… same quantity for multiple uses saves time & ensures accuracy

  6. track your work… leave bread crumbs…just in case: confirmation omission errors assurance

  7. target based design/estimate… g

  8. methods, tips & tricks… scope of work

  9. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) sample of drawings provided by designer:

  10. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) scope of work as provided by designer: location: 15 miles from St. Andrews, Scotland lot size: 430’ x 230’, level site, solid base, rock plan view: 42’ ᶲ @ base & 14’ ᶲ @ top floor elevation: 116’ tall - 90 courses of stone specifications: solid granite outside casing, sandstone inner core…engineered connection of stone…light room shell is cast iron w/ copper…roman cement at exposed areas

  11. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) scope of work realities @ site: location: 15 miles of the coast of Scotland site: treacherous submerged reef 12’ below surface @ high tide 4’ above surface @ low tide weather: brutal storms most of the year 5 month window / year of “decent” weather

  12. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) scope of work realities @ time: materials: granite & sandstone shortage economics: currently @ war w/ France $’s funneled to war effort labor shortages

  13. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) scope of work realities @ construction: temporary construction: floating lighthouse temporary housing: 2 schooners & structure equipment: balance crane, swing crane, winch crane, beam crane, rail tracks, wagons, sling carts, pumps, jacks & wedges stone delivery: schooner - 2 praams - site

  14. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811) scope of work realities @ completion: budget: $80,000 (in 1807 $’s) final cost: $120,000 (in 1811 $’s) lesson #1: 50% overrun due to designers lack of understanding of scope in terms of site, time and construction context lesson #2: estimator must understand scope

  15. scope of work tangent… Bell Rock Lighthouse, Scotland (1808 - 1811)

  16. methods, tips & tricks… build it before you build it…

  17. visualize & plan…

  18. seems like a daunting task…

  19. end of lecture #6