Shelley Trulock Jacksonville District Project Manager. AIWW / IWW Update for Jacksonville District. AIWW Overview in Jacksonville District. AIWW – Norfolk to St. Johns Fernandina Harbor, Fl south to the St. Johns River. 21.9 miles long.
E N D
Shelley Trulock Jacksonville District Project Manager AIWW / IWW Update for Jacksonville District
AIWW Overview in Jacksonville District • AIWW – Norfolk to St. Johns • Fernandina Harbor, Fl south to the St. Johns River. • 21.9 miles long. • 12’ deep x 90’ wide in land cuts and narrow streams. • 12’ deep x 150’ wide in open waters.
N CHANNEL 12 ‘ DEEP x 90’/150‘ WIDE JACKSONVILLE Gulf of Mexico TAMPA AtlanticOcean MIAMI AIWWNORFOLK, VA TO ST. JOHNS RIVER
IWW Overview in Jacksonville District • IWW • Jacksonville, Fl (St. Johns River) to Miami, Fl. • 349 miles long. • 12’ deep x 125’ wide from Jacksonville, Fl south to Fort Pierce, Fl. • 10’ deep x 125’ wide from Ft. Pierce, Fl south to Miami, Fl.
N Jacksonville Tallahassee CHANNEL 12 FT DEEP X1 25 FT WIDE Cape Canaveral Atlantic Ocean Gulf of Mexico Ft. Pierce Tampa CHANNEL 10 FT DEEP X 125 FT WIDE Miami IWWJAX TO MIAMI
AIWW / IWW Overview in Jacksonville District • Jacksonville District has authorization to maintain all 370.9 miles of the AIWW and IWW. • Divided into reaches, typically by County. • Dredging is determined via condition surveys to determine where the most significant shoaling is occurring. • Federal Channel with a “low use shallow draft” designation = No Federal funding. • FIND will be taking the lead until Jacksonville District receives additional Congressional Adds. • Corps will not even be able to perform condition surveys.
FY 11 President’s Budget $350K. Caretaker Activities – real estate activities, condition surveys, environmental activities. Completed dredging in the Matanzas Reach with Contributed Funds from FIND and Bakers Haulover reach with Federal funding. Completed construction of DMMA MSA 641 with ARRA funds and Contributed funds from FIND. Initiated construction of DMMA IR 2 with Contributed Funds from FIND. FY 2011 Projects AIWW / IWW Jacksonville District
FY 2011 Maintenance Dredging/DMMA Construction Intracoastal Waterway, FL Pensacola Jacksonville Tallahassee Florida IWW Matanzas O&M Gulf of Mexico Orlando Cocoa Tampa DMMA IR2 West Palm Beach DMMA MSA 641 Ft. Myers Miami IWW Bakers Haulover O&M Key West
FY 12 President’s Budget $0 Dredge St. Augustine with Contributed Funds from FIND. Finish construction of DMMA IR2. Complete permit application for Sawpit with Contributed Funds from FIND. FY 2012 Projects AIWW / IWW Jacksonville District
FY 2012 Maintenance Dredging Intracoastal Waterway, FL Pensacola AIWW Sawpit (FIND) Jacksonville Tallahassee Florida IWW St. Augustine O&M (Corps) Gulf of Mexico Orlando Cocoa Tampa IWW Indian River Reach 1 O&M (FIND) West Palm Beach Ft. Myers IWW Palm Beach Reaches 3 & 4 O&M (FIND) Miami Key West
Continued lack of adequate funding for dredging operations to fully maintain the waterway as authorized: 12’/10’ Deep x 125’ Wide. Pot of money that can be used for waterways such as the AIWW/IWW? Economic impact of not maintaining the waterway? Tourism. Real estate values. Regionalization pros & cons. One Voice/consistent message. Loss of institutional knowledge (State issues/regulatory). Jacksonville DistrictAIWW / IWW Issues & Concerns