50 likes | 170 Views
SC B2 Overhead Lines. Quesito 1: Quali sono gli indirizzi emersi che guideranno la prossima attività del Comitato?. The current and future studies are conducted according to the following stategic decisions: Acceptability of OHL Increase capacity of existing OHL
E N D
SC B2 Overhead Lines Quesito 1: Quali sono gli indirizzi emersi che guideranno la prossima attività del Comitato? • The current and future studies are conducted according to the following stategic decisions: • Acceptability of OHL • Increase capacity of existing OHL • Increase of reliability and Availability of OHL • And grouped in four key themes: • Electrical performance (new conductors; Dynamic and enhanced line rating systems; Conversion of existing AC lines to DC,…) • Towers, foundations and insulators (Industry practices for tower design, testing technologies, environmental aspects and innovative solutions,… • Mechanical behaviour of conductors and fittings (fatigue; wind induced movements; assessment o fittings; updating and new standards;………..) • Asset management, reliability and availability: (GIS; lessons from big storm events; anti and de-icing systems; Live Line Maintenance;……….) 1 1 Latina, 24 novembre 2010
SC B2 Overhead Lines Quesito 2: In quale dei TC projects il Comitato è integrato? The 4 Major Strategic Directions are : Direction 1: The electrical power system of the future Direction 2: Focus on environment and sustainability Direction 3: Making the best use of the existing power system Direction 4: Interactive communication with the public and political decision makers Selected items for SCB2 are the following: Firstly, major concern of to the public is the impact of the system on the environment. EMF, noise emission, aesthetic issues… Secondly, issues where the environment influences the power systemare to be taken into account. Increasing frequency and severity of extreme weather conditions can be observed, more is to be expected. On the transmission level, an urgent global need for increased transportation capacity is thus obvious. HVDC and AC transmission at the highest voltage levels are/will have to be implemented and also combination of AC and HVDC systems (Hybrids) 2 2 Latina, 24 novembre 2010
SC B2 Overhead Lines Quesito 3: Quali sono i WGs (di prossimo avvio) più interessanti (per il settore nazionale)? 3 3 Latina, 24 novembre 2010
SC B2 Overhead Lines Quesito 4: Quali sono i temi principali per la Sessione 2012? PS1 > Improved utilisation of OHL • Electrical optimisation of existing rights of way including new conductor technologies • Conversion of AC lines to DC operation • Line monitoring and dynamic line rating methods • Sharing rights of way with other parties PS2 > Condition and Assessment of OHL • Operational data collection for asset management • Diagnostics tools and methods for reliability and remaining life of line components assessment • Mechanical dynamic behaviour, seismic risk and extreme weather conditions PS3 > Maintenance and Refurbishment of OHL • Live line work, robots, drones • Use of information systems, maintenance policy, efficiency of different methods and strategies • Examples of refurbished lines 4 4 Latina, 24 novembre 2010