SC B2 Pfeferential Subjects 2014 . First D raft TC Meeting Barceleona March 2012. B2 issues. Emergency issues ( system recovery ) Efficiency of OHL ( losses) Distribution issues Tower design (hybrid tower, top geometry ), poles Conductor issues (stringing, creep, HT)
E N D
SC B2 PfeferentialSubjects 2014 First Draft TC Meeting Barceleona March 2012
B2 issues • Emergency issues (systemrecovery) • Efficiency of OHL (losses) • Distribution issues • Tower design (hybrid tower, top geometry), poles • Conductor issues (stringing, creep, HT) • Safety and earthing
Joint Session with B1 • Comparison • technical, • economical • environmental • Combination (Siphon-Lines) • Special issues (HV Cables on OHL Supports)