An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEOTECHNICAL CONSTRAINTSIN STORMWATER INFILTRATION PRACTICE Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011

  2. Overview of Presentation Established Geotechnical Practice Typical Geotechnical Constraints Where Infiltration Practices Are Discouraged Typical Mitigation Measures Integrating Geotechnical Considerations Into Stormwater Design

  3. Established Geotechnical Practice Geotechnical Engineers are concerned with hazards associated with geologic conditions on development projects including: Slope Stability Foundation Design Shrink Swell Potential of Soils Groundwater

  4. “New” Stormwater Management Considerations Infiltrate rainfall runoff into ground or open space where feasible. Construct stormwater Integrated Management Practices (IMPs) near roadways and structures. Disperse on-site IMPs as much as possible.

  5. Typical Geotechnical Constraint – High Groundwater Table

  6. Geologic Variability in Contra Costa County

  7. Typical Geotechnical Constraint – Foundation

  8. Typical Geotechnical Constraint – Deep Fill

  9. Typical Geotechnical Constraint – Cut Areas

  10. Mitigation Measures Avoid discharging stormwater on slopes whenever possible In clay soils, un-lined stormwater IMPs should be located away from movement-sensitive improvements (pavements/structures etc.) Line IMPs in areas with potential geologic hazards as noted in previous slides IMPs that rely solely on infiltration will not function in clay soils due to extremely low soil permeability and will be likely to trigger problems described above

  11. Integrating Geotechnical Considerations Into Your Stormwater Design Consult a geotechnical engineer in the stormwater control plan (SWCP) early on Identify areas where infiltration practices are impractical Line IMPs or locate to areas where risks to structures, slopes and groundwater are lessened Confirm subsurface conditions beneath larger IMPs during construction phase

  12. QUESTIONS? Presented: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000