1 / 15

ASIPP

HT-7. ASIPP. Daily Operation Report Operation Team I. X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang. 22 –23 May 2004. Synergy of LHW+IBW (08:30-13:00) Ip Ramp-down (15:30-20:30) Probe Scan (01:30-06:30) SXS Calibration ( LHCD) (06:30-08:00) Shot No. #69280~#69***.

aron
Download Presentation

ASIPP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HT-7 ASIPP Daily Operation Report Operation Team I X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang 22 –23 May 2004

  2. Synergy of LHW+IBW (08:30-13:00) • Ip Ramp-down (15:30-20:30) • Probe Scan (01:30-06:30) • SXS Calibration ( LHCD) (06:30-08:00) • Shot No. #69280~#69*** • It: 3500A-4100A • Pout~2.5E-4Pa Pin~4.5E-4Pa-9.0E-6Pa • PLHW:~280KW PIBW:~220KW • 2#TMP Quench! IBW system ?

  3. Synergy of LHW+IBW(I)

  4. Synergy of LHW+IBW(II)

  5. IP Ramp-down (I)

  6. IP Ramp-down (W/O IBW)

  7. IP Ramp-down with LHW

  8. IP Ramp-down(0.5MA/s~1.2MA/s)

  9. Probe Scan (T.Lan USTC) IP~100KA/150KA ne~1.0/2.0

  10. IP Ramp-down (OH Discharges)

  11. SXS detector calibration with LHCD

  12. High performance & long pulse discharges with LHW

  13. Density uncontrollable

  14. Density controllable ~after Boronization

More Related