150 likes | 443 Views
HT-7. ASIPP. Daily Operation Report Operation Team I. X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang. 22 –23 May 2004. Synergy of LHW+IBW (08:30-13:00) Ip Ramp-down (15:30-20:30) Probe Scan (01:30-06:30) SXS Calibration ( LHCD) (06:30-08:00) Shot No. #69280~#69***.
E N D
HT-7 ASIPP Daily Operation Report Operation Team I X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang 22 –23 May 2004
Synergy of LHW+IBW (08:30-13:00) • Ip Ramp-down (15:30-20:30) • Probe Scan (01:30-06:30) • SXS Calibration ( LHCD) (06:30-08:00) • Shot No. #69280~#69*** • It: 3500A-4100A • Pout~2.5E-4Pa Pin~4.5E-4Pa-9.0E-6Pa • PLHW:~280KW PIBW:~220KW • 2#TMP Quench! IBW system ?
Probe Scan (T.Lan USTC) IP~100KA/150KA ne~1.0/2.0