HT-7. ASIPP. Daily Operation Report Operation Team I. X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang. 31 May ~ 01 June 2004. ICRF Cleaning + Boronization (08:30-11:00) OH Discharges after Boronization (12:30 –22:30) Long Pulse Discharges(22:30-07:30) Shot No. #71161~#71341.

uta
Download Presentation

ASIPP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HT-7 ASIPP Daily Operation Report Operation Team I X.Gong, H.Wang, Y.Jie, J.Huang, Z.Chen, Y.Xu, X.Zhang 31 May ~ 01 June 2004

  2. ICRF Cleaning + Boronization (08:30-11:00) • OH Discharges after Boronization (12:30 –22:30) • Long Pulse Discharges(22:30-07:30) • Shot No. #71161~#71341 • It: 2800A-4000A • Pout:2.5E-4Pa Pin:1.0E-3Pa~8.0E-6Pa • PLHW:100KW~200KW

  3. OH Discharges (I)after Boronization

  4. OH Discharges (II) After Boronization

  5. Long Pulse Discharges Testing with LHW

  6. Long Pulse Discharge(I) impurities

  7. Long Pulse Discharge(II)OH Free

  8. Long Pulse Discharge(III)

  9. The Longest Pulse Discharge(106.99s)