1 / 10

ASIPP

HT-7. ASIPP. Daily Operation Report Operation Team I. X. Gong , Z. Zheng, H. Wang, C. Hu, C. Xie , A.Ti. 11-12 Dec 2005. Experimental Topic 1 ) ICRF experiment for DIA_CO2 OH discharges for DIA_TS GAM & Probe Scan Plasma ramp-up/down +DNB

ulani
Download Presentation

ASIPP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HT-7 ASIPP Daily Operation Report Operation Team I X. Gong, Z. Zheng, H. Wang, C. Hu, C. Xie, A.Ti 11-12 Dec 2005

  2. Experimental Topic • 1) ICRF experiment for DIA_CO2 • OH discharges for DIA_TS • GAM & Probe Scan • Plasma ramp-up/down +DNB • ICRF Boronization and OH discharges after Bnz • It:2000A-3900A • Vacuum Pressure: 2.0E-5Pa • Wall Temperature: 30C~150C • ICRF: ~250kW LHCD: ~100kW • Shot No.#82617~#8278x

  3. ICRF Experiment for DIA_CO2

  4. OH Discharges for DIA_TS

  5. GAM

  6. Probe Scan

  7. Plasma Ramp-up/Down

  8. DNB

  9. 2nd ICRF Boronization • Pre RF+Taylor Discharge Cleaning (1h30mins) • Prf:5~25kw, It:2000A • Last time: 1h30mins • 3g Carborane • Only 30mins low power RF-DC after Bnz • Wall temperature: RT • Without Taylor assistant

  10. High Hydrogen Recycling lead to Uncontrollable Density How to optimize RF-Boronization procedure to be suitable for long pulse discharge?

More Related