RENAISSANCE ZARAGOZA Progress Report WP3

5th RENAISSANCE meeting- Zaragoza 24-25/04/2008. RENAISSANCE ZARAGOZA Progress Report WP3. Juan Rubio del Val Jefe del Area de Rehabilitación Urbana y de Innovcación Residencial Sociedad Municipal de Rehabilitación Urbana de Zaragoza. WP 3. Valdespartera

arvid
Download Presentation

RENAISSANCE ZARAGOZA Progress Report WP3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 5th RENAISSANCE meeting- Zaragoza 24-25/04/2008 RENAISSANCE ZARAGOZA Progress Report WP3 Juan Rubio del Val Jefe del Area de Rehabilitación Urbana y de Innovcación Residencial Sociedad Municipal de Rehabilitación Urbana de Zaragoza

  2. WP 3 Valdespartera • Plots 17,18 and 13 continue on schedule: Plot 17: started the 9.1.2006; to be completed: June 2008. Pending latest works. Plot 18:started on 5.6.2006; to be completed: October 2008. The closing of the windows has been done. The construction of the building is in an advanced state. Plot 13: started on 12.6.2006; to be completed: septiembre 2009. The three plots are pending the modification of the urban network to bring more electrical power

  3. WP 3 • Plot 12 almost finished: • The electric installation is pending on the final urbanisation. • Gas installation finished. • Heating systems pending on trying the electricity with the boilers

  4. WP 3 PICARRAL -Municipal licenses obtained Anzánigo street General Yagüe street

  5. WP 3 PICARRAL • At the moment we are obtaining different construction budgets for the Neighbourhoods of : Picarral: Anzanigo 10-12 y Gnral Yagüe 2-4-6-8 • New contracts have been made for the new Office of Refurbishment in San Blas street number 37

  6. WP 3 Continuing the Study of the third possible location of the wind turbine The location of the wind turbine in the plot 5- 103 of Saragossa is being studied. The best place considered is the coordinate UTM X 672.049, UTM Y 4.609.255. • Possible problems • Plot 15 of the 105 poligono will be affected • The distance to pre existing infrastructure is not too much: high electric tension, Forth City Ring Road (the distance is less than the double height of the wind turbine) • It is considered necessary to have an “evacuation line” for the wind turbine, it is necessary to cross the Forth City Ring Road (above or through a subterranean way) and design the RSMT and the SET Valdespartera in an urbanized area

  7. WP 3 CANDIDO DOMINGO SCHOOL • The Energy Eco efficiency Ordinance and The Use of Renewable Energy has been adopted for the Town Hall. • The project for the isolation of the facade is done and depends now on the municipal approval.

  8. WP 3 THE EXHIBITION CENTER IN VALDESPARTERA • During the execution of the building some technical solutions have been taken, however the initial design project is preserved. • To the 28th of February, 519.427,84€ has been certificate, a 22% of the total budget.

  9. CONCLUSIONS Contact: Juan Rubio del Val San Pablo, 48 Zaragoza Telf: 00 34 976 405 911 jrubio@smruz.es Paloma Bozman San Pablo, 48 Zaragoza Telf: 00 34 976 40 59 12 pbozman@smruz.es