CS280 Side Guide Rails hole and gap mismatch. Responsible: Davis/Johnson Approved by: Wigant Date: 8/1/2012. GTG: . Y. Y. Is / Was. Description: CS has issues with hole miss-alignment between Side Guide Fittings installed in CS260 and Side Guide rails installed in Cs280
E N D
CS280 Side Guide Rails hole and gap mismatch Responsible: Davis/Johnson Approved by: Wigant Date: 8/1/2012 GTG: Y Y Is / Was • Description: • CS has issues with hole miss-alignment between Side Guide Fittings installed in CS260 and Side Guide rails installed in Cs280 • CS 280 has exaggerated shim gaps getting side guide rails to line up with Side guide fittings resulting in 32 NC conditions since Lu79 in BSC and more in EVt • Closure Criteria: • 3 consecutive Ship sets with no hole or gap issues in CS280 • Proposal re-evaluated / readjusted for 4 day flow rate Applicability: -9 -10 -8 Line no. Target : 126 Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: Milledgville / Y Ahmed Originating Organization: ME Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:_42_TBD_ Cr path reduction:__3 hr__ As Designed Analysis complete Create Team and Charter Analyze Potential solutions As Built Analysis Complete, Short term solution Tested Schedule BOEING PROPRIETARY ECCN 9E991