1 / 11

Sustainable Tourism Development (STD ) Project

Prepared by Mr. Pheng Chantitthya Dr . Aung Soe Htet Ms . Kamonwan Apiruji Mr. Nguyen Hoang Duong. Sustainable Tourism Development (STD ) Project. Executive Summary Stakeholders Analysis Problem Tree Objective Tree DMF WBS MS Project. Outline.

ashby
Download Presentation

Sustainable Tourism Development (STD ) Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prepared by Mr. PhengChantitthya Dr. AungSoeHtet Ms. KamonwanApiruji Mr. Nguyen Hoang Duong Sustainable Tourism Development(STD) Project

  2. Executive Summary Stakeholders Analysis Problem Tree Objective Tree DMF WBS MS Project Outline

  3. As many rapid growth city, LuangRiep Hoi has faced various problems according to the numbers of tourists visiting the city at a time. Therefore, this project will focus on the tourism aspect as it tends to be the focal problem leading to other problems. The main concern in this respect is to improve the tourism image both at the local or national levels through a PR programme. Executive Summary

  4. Stakeholder Analysis

  5. Stakeholder Analysis (Cont.)

  6. Problem Tree

  7. Objective Tree

  8. Design and Monitoring Framework

  9. Design and Monitoring Framework

  10. Design and Monitoring Framework

  11. Work Breakdown Structure $121,500 $14,500 $31,500 $55,500 $20,000 $500; 0.5 mth; MoT $3,000; 2 mth; MoT $5000; 0.5 mth; Cordinating board $10,000; 1mth; MoT $2,000; 2 mth; MoT $500; 0.5 mth; Working committee $10,000; 1 mth; MoICT 0.5mth; Each involved stakeholder $1000; 1 mth; MoT $20,000; 1.67 mth; the board $5,000; 3 mth; MoT $4000; 1mth, the board $1,000; 1 mth; MoT $3,000; 0.5 mth; Working committee $100,000; 0.3 mth; MoT $500; 0.4mth; the board $3,000; 1 mth; Working committee $40000; 3 mth; MoT $3,000; 1.5 mthMoT