An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metaldyne Korea Business review for the first half of 2014 June 3, 2014

  2. Table of contents 1/10 1. Production Status 2. Productivity 3. Production Plan (sales) 4. Materials & Supplier 5. Logistic cost 6. Delivery & Inventory 7. Application of EURO-6 R-BSM 8. Maintenance 9. New business in 2014

  3. 1. Operation- Production (Calendar day) 2/10 Production status PCS Plan Vs Actual for Theta BSM Plan Vs Actual for R-BSM Plan Vs Actual for FEMA ※ Theta BSM exceed the target about 12%, R BSM meets the target and Tau FEMA exceed the target about 15%.

  4. 2. Operation - Productivity 3/10 Actual QPPLH for Q2, 2014 QPPLH Target Target 2.60 1.2% ※ QPPLH meet our target which was 2.60 and recorded 2.70 during first half year. -. Continuously try to achieve QPPLH goal even though production volume decrease in the second half year.

  5. 3. Operation – Production Plan (sales) 4/10 - Theta MPI,GDI Demand will drastically decrease about 23.7% compared to first half year - MKL has been operationg3 shifts for Theta Line (May) - There will be 2.5 shifts in October (※ 4 shifts – 104 workers, 3.5 shifts – 91 workers, 3 shifts– 81 workers, 2.5 shifts – 75 workers) - There will be R-BSM volume increase (KMC – New SORENTO & New Carnival) - Glovis Back order was cleared in May

  6. 4. Operation – Materials & Supplier 5/10 1. Local suppliers 2. Overseas suppliers % of Material Cost against Sales - SEOUL INDUSTRY 3,988 include raw material cost of KONEC and WONTAE

  7. 5. Operation - Logistic cost 6/10 Domestic Delivery Cost It’s cheaper using regular freight than using expedited freight - If there happens to deliver small amount, it’s better use 1 ton truck instead 5 ton truck (Our contractor) [ Cost Comparison ] 1-ton : 250,000 won (expedited truck) 5-ton : 750,000 won (regular truck) Air Freight Cost Most of all air freight cost result from sending & receiving SAMPLES (GM XLDE) Material cost incurred due to Acument (4,367,467 won – in January) ---> Delayed for product lead time

  8. 6. Operation - Delivery & Inventory 7/10

  9. 7. Operation – Application of EURO-6 R-BSM 8/10 Background MKL’s objective is to successfully apply new version (Euro 6) of R-BSM while improving fuel efficiency performance through the reduction of journal dia and friction Concentrated inventory management of Euro 5 & 6 Management with the objective of complete clear of subcontractor’s material inventory related to R-BSM Euro 5 (6thMay) 2) In accordance wih the H,KMC’s application date(May15th),M&A team would tightly control the subcontractor’s production date of Euro 6 -> Successful Running Change with no material excess => Successful application management of Euro 6 with excellent inventory control of Euro 5-> “ZERO” inventory ( HMC 9th May , KMC 13thMay)

  10. 7. Operation – Maintenance Status 9/10 Total maintenance cost Maintenance cost trend 216 Mil Won Maintenance issues • Moved machines (MCT, Washer & Leak Tester)for Tau FEMA to KODACO on March 21st  This is to secure the space for GM-XLDE line • Need to consider using the parts from the idle SW machine to secure spare inventory.  Some of parts for SW M/C is not manufactured. Parts cost is so expensive. • Replaced lights from Metalhalide to LED on May 1st  Expected payback is 20month and approximately 2milion won would be saved per month. • Installed R-eng Robot Air blow to improve the cleanliness on May 7th

  11. 8. Operation – New business in 2014 10/10 Schedules for New Program • GM 2.8L XLDE Balance Shaft Module • -. All production equipments for GM XLDE BSM will be done by end of June. • -. Polisher & Washer for balance shafts already installed and completed try-out. • -. Assembly line & EOL tester will be delivered on middle of June after delivery of PPV samples • DoosanG2 D34 Mass Balance Shaft • -. Investigating supplier quotations for production line. • -. Need to install all production line at least middle of October.

  12. 8. Operation – New business in 2014 10/10 Production Equipment for GM XLDE Washer Polisher Assembly Line EOL Tester

  13. 9. Operation – R-eng Volume-up plan 9/10 Budget VS. 5 month forecast Production line Capacity Volume-up Plan