50 likes | 232 Views
Flow Network Construction. Gas Lift Scenario. Production. Lift-gas. Wing & Master Valve. Flowline Choke. Controller or Casing Choke. 10. 11. 20. 12. 27. 25. 26. 21. 22. 13. 3. Separator. 4. 15. 14. 16. 5. Compressor 1. From Well. 23. Compressor 2. To Well.
E N D
Flow Network Construction Gas Lift Scenario
Production Lift-gas Wing & Master Valve Flowline Choke Controller or Casing Choke 10 11 20 12 27 25 26 21 22 13 3 Separator 4 15 14 16 5 Compressor 1 From Well 23 Compressor 2 To Well Production Header 24 Gas Header Compressor 3 From Well Gas Lift Valve To Well Tubing Valve Choke Measurement # Casing Packer 1 Perforations 1 2 Draw the real world diagram indicating measurement points
Production Lift-gas Wing & Master Valve Flowline Choke Controller or Casing Choke F 10 11 20 E 12 B 27 25 26 21 22 13 A 3 Separator 4 15 14 16 5 C Compressor 1 D From Well H G 23 Compressor 2 To Well Production Header 24 Gas Header Compressor 3 From Well Gas Lift Valve To Well Tubing Valve Choke Measurement # Unit Boundary Unit Name Casing Packer 1 Perforations 1 2 A Draw Boundary around items with no measurements
Production Lift-gas E F 10 11 20 12 C 27 25 26 B 21 22 13 3 G H Separator 4 15 14 D 16 5 A Compressor 1 From Well 23 Compressor 2 To Well 24 Compressor 3 From Well To Well Measurement # Unit Flow (from/to port) 1 F 1 2 The boundary becomes a Unit in the flow network.