1 / 34

Islanding schemes southern region

Islanding schemes southern region. SRPC, Secretariat. Ramagundam & Hyderabad IC 2600 MW Load 1400-1800 MW. RTPS 600 MW. Simhadri TPS IC 5 00 MW. Kothagudem TPS. Jindal 100 MW on House Load. BTPS Gen 300 MW. Vijaywada TPS. KAIGA12 670 MW KAIGA34 315 MW. Rayalaseema TPS

asta
Download Presentation

Islanding schemes southern region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Islanding schemes southern region SRPC, Secretariat

  2. Ramagundam & Hyderabad IC 2600 MW Load 1400-1800 MW RTPS 600 MW Simhadri TPS IC 500 MW KothagudemTPS Jindal 100 MW on House Load BTPS Gen 300 MW VijaywadaTPS KAIGA12 670 MW KAIGA34 315 MW Rayalaseema TPS IC 300-350MW VARAHI 230 MW CHENNAI KDPP Kuttiady Total Gen-60-230 MW Total Load 150-250 MW NEYVELI METTUR Idukki, LPeriyar , Chalakudy Total Gen 300-1200MW Total Load 900-1100 KUNDAH Kayamkulam, Sabarigiri , Kakkad Gen 300-600 MW Load 420-660 MW TUTICORIN

  3. KARNATAKA ISLANDING SCHEMES

  4. Jindal Back JINDAL WILL GO ON HOUSE LOAD

  5. BTPS BTPS1 unit of 500 MW with reduced generation (300MW) Loads =290 MW BTPS UNIT 2 ON HOUSE LOAD Back

  6. Lingasugur RTPS 100 MW Kushtagi 70 MW Sindhanur BTPS Gooty Gadag Lingapur Harthi Alipur 65 MW JSW Munirabad 55 MW HiriyurPGCIL BMM ISPAT Guddadahalli PGCIL Guttur The total load is about 290 MW BTPS Back

  7. BTPS Back

  8. KAIGA12 Back

  9. Kollapur 40 MW Kuduchi 33 MW 65 MW Bagalkot Athani Chikkodi Belgaum 52 MW Supa110kV 55 MW Vajramatti Kanabargi Mahalingapur -55 MW Ambewadi 90 MW Ponda Tadas 55 MW 25 MW 70 MW Narendra Soundatti Kadra KSHally 65 MW Hubli Harti Bidnal Nagjari 55 MW Karwar Kaiga Unit-1 & 2 50 MW Sirsi 4 MW KaigaICTs The total load is about 670 MW SGS KAIGA 12 Back

  10. KAIGA 12 Back

  11. KAIGA34 Back

  12. KAIGA34 Back

  13. KAIGA 3 & 4 Back

  14. VARAHI Back

  15. Shanthigrama PGCIL MRS Shimoga 90 MW Kemar UPCL Varahi 90 MW Kavoor Kudremukh 50 MW Puttur Total Load is about 230MW VARAHI Back

  16. VARAHI Back

  17. RTPS Back

  18. RTPS Back

  19. RTPS Back

  20. Rayalaseema TPS Back Details

  21. Ramagundam & Hyderabad Back Details

  22. Simhadri Back Details

  23. Kothagudem TPS Back Details

  24. KERALA ISLANDING

  25. Kayamkulam, Sabarigiri and Kakkad Total Generation 300-600MW Total Load 420-660 MW Back Details

  26. Kayamkulam, Sabarigiri and Kakkad Back LOAD SHEDDING FROM 10-130 MW REQUIRED

  27. Idukki, Lower Periyar and Chalakudy Total Gen 320-1200 MW Total Load 900-1110 MW Back Details

  28. Idukki, L Periyar , Chalakudy LOAD SHEDDING FROM (-)50-600 MW REQUIRED Back

  29. KDPP and Kuttiady Total Gen 20-90 MW Total Load 150-250 MW Back Details

  30. KDPP Kuttiady Back LOAD SHEDDING FROM (-)20-100 MW REQUIRED

More Related