270 likes | 443 Views
September 24 th 2013 KYTC D3 Incident Management Meeting. Hurricane Ike, 2008. Schedule . TIM Training Major Incidents (6/17 – 09/24 ) Construction Updates Upcoming Events Conclusions .
E N D
September 24th 2013 KYTC D3 Incident Management Meeting Hurricane Ike, 2008
Schedule • TIM Training • Major Incidents (6/17 – 09/24) • Construction Updates • Upcoming Events • Conclusions Emergency crews assist the STAT Care pilots as they come in to land the helicopter on the Cumberland Parkway, near the Barren-Metcalfe County line
June ??I-65 N Warren County?Semi w/ cars loaded caught on fire
Cumberland Pkwy WB MP 5 Overturned CMV Thurs July 25th • Difficult to extricate driver • Both WB lanes shut down 2-4 hrs • One lane shut down for 8 hrs • Saf-Ti-Co drove from Louisville for traffic control • Another company closer to area may start providing traffic control? TPM?
Cumberland Pkwy WB MP 5 Overturned CMV Thurs July 25thFell Asleep while Driving
Cumberland Pkwy EB 33 Fatal Crash Friday August 2nd, Fell Asleep • Metcalfe/Adair County Line • Unit 1 Vehicle VS Unit 2 CMV Fatal Crash • 3 hr closure • Unit 1 fell asleep, dropped off left side of road, overcorrected • Traveled across westbound lanes, hit oncoming Ryder Freightliner Truck • Driver of Unit 1 was killed
Natcher Pkwy Warren Co MP 10 NBThursday, Aug 8th Garbage Truck
I-65 Hart Co MP 56 NBMon Aug 26th 15 hr closure – 36,000 lbs Used Batteries Driver Fell Asleep
I-65 Hart Co MP 56 NBMon Aug 26th 15 hr closure – Used Batteries
I 65 Simpson Co MP 12 NBThurs Sept 5th Hot! Dogs Shut down for 2 hrs, 2 of 3 lanes closed for 8 hrs
Cumberland Pkwy Metcalfe Co EB MP 34 Mon Sept 9th • Single Vehicle Crash involved a 160k lb Crane Truck, lost control • Roadway was damaged • 3 hrs to extricate due to unstable vehicle • Crane arrived from BG • Low boy arrived from Louisville • Road closed EB for 10 hrs • Detour thru Edmonton to Columbia
I-65 Construction Updates • Widening of I 65 to 3 lanes from Cave City to Hart County line is complete with corrective/finishing work beginning • From Hart County line to rest area - the northbound traffic will be moved from the outside lanes and will by split by a barrier wall
Outer Loop/Cumberland PkwyInterchange Updates • Work will be continuing into early 2014 with the temporary parkway crossing (for construction vehicles) continuing until the bridge over the parkway is complete this winter. • The twin bridges (which overpass KY 1297) will be switching traffic from inside lane to outside lane in both directions this fall and with a wide load restriction implemented