Task 12: “PV-environmental health and safety (EH&S) activities”

Task 12: “PV-environmental health and safety (EH&S) activities”. Oslo, 17.oktober 2006 Ragnar Tronstad, Elkem Solar AS. Tilbakeblikk. Task 12: “PV-environmental health and safety (EH&S) activities” Foreslått på 25. IEA PVPS ExCo Møte i Melbourne - april 2005

atalo
Download Presentation

Task 12: “PV-environmental health and safety (EH&S) activities”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task 12: “PV-environmental health and safety (EH&S) activities” Oslo, 17.oktober 2006 Ragnar Tronstad, Elkem Solar AS -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  2. Tilbakeblikk • Task 12: “PV-environmental health and safety (EH&S) activities” • Foreslått på 25. IEA PVPS ExCo Møte i Melbourne - april 2005 • “Task definision meeting” i Barcelona - juni 2005. • 27. IEA PVPS ExCo Møte i London - april 2006 • ExCo USA - følge opp teknisk ledelse av Task 12 • ExCo EPIA - følge opp administrasjon av prosjektet • ExCo medlemmer støtter deltakelse i “EPIA’s EH&S Workshop” • ExCo medlemmer støtter deltakelse i “Task 12 Workplan” møte • “IEA PVPS Task 12 EHS Activities Meeting” gjennomført med ekspertpanel i september 2006. • Resultater av Dresden møte danner grunnlaget for presentasjonen -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  3. Arbeidsplan for Task 12 ble diskutert i Dresden -september 2006 • Prosjektets varighet: 2007 til 2012 • Basert på input fra 22 eksperter fra 12 IEA PVPS medlemsland • Skal legges frem for godkjenning på 28. IEA PVPS ExCo møte, 26-27 oktober 2006 i Korea. • Task 12 visjon: “Task 12 aims in fostering international collaboration in the areas of safety and sustainability which are crucial for allowing PV to grow to levels enabling a major contribution in the needs of the member countries and the world. • Miljøvennlig energi rettferdiggjør satsing på solcelle-teknologi. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  4. Deltakere i Dresden -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  5. Målsetninger for Task 12 • Gjøre en felles forståelse av HMS punkter tilgjengelige for de enkelte medlemsland og spre arbeidsgruppens kunnskap og forståelse til medlemsland og beslutningstakere innen energi- og miljøspørsmål. • Delmål: • Kvantifisere den miljømessige profilen i forhold til andre energiproduserende teknologier. • Definere og påpeke HMS og bærekraftige punkter med viktighet for markedsvekst. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  6. Arbeidsprogrammer som understøtter målsetningene: • Delmål 1: Kvantifisere miljøprofil Lifssyklus analyser-LCA SoG-Si Ingot Wafer Solcelle Moduler Systemer Bruker ? Energi Material Utslipp Sammenligning med alternative teknologier for energileveranse -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  7. Forts. Arbeidsprogrammer…. HMS og bærekraftige punkter med viktighet for markedsvekst • Delmål 2: PV-industri Material tilgjengelighet Resirkulering Hendelser Industri Myndigheter Offentlighet Fakta ark Rapporter -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  8. Konseptuell plan for HMS oppgaver De fleste oppgaver antas å være av generell interesse for alle interessegrupper Spesielle behov kan fremmes gjennom medlemslandets representant. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  9. Beskrivelse av de enkelt aktiviteter • SubTask 1: Recycling of Manufacturing Waste and Spent Modules • Leaders: K. Wambach and EPIA/PVCycle • Objectives: · Assist the development of collection infrastructure by examining and evaluating the collection infrastructure of other recyclables (e.g., electronics, liquid crystal displays) • Enhance the interaction among industry players so that they share information and resources for collection and recycling • Show the technical and cost feasibility of collection and recycling (to environmental-policy makers, e.g., WEEE, RoHS) • Identify common tasks where financial resources can be shared (e.g., hydrometallurgical extraction of semi-metals from glass PV matrices, separation of EVA from the module). -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  10. SubTask 2: Life Cycle Analysis • Leaders: A. Alsema and V. Fthenakis • Objectives: • Establish and demonstrate, with comprehensive and transparent studies, that PV systems are safe and environmentally friendly in all their life-cycle stages. • Show the improvement trends of the PV environmental profile by certain indicators (e.g., EPBT, GHG emissions, waste reduction). • Continue showing such progress in annual updates over the course of Task 12 (5 years). • Valuate the environmental benefits of PV by showing avoided “external” costs. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  11. Subtask 3: EH&S in Manufacturing Facilities • Leaders: V. Fthenakis, with Japanese and European EH&S specialists • Subtask Objectives: • Gather incident data and establish data-base to be shared by stake holders • Evaluate data, develop risk factors and compare with other energy technologies • Identify accident prevention and control options for specific technologies • Subtask 4: EHS Information Dissemination • The methods and results obtained from sub-tasks 1-3 above will be communicated and disseminated by various target-oriented communication tools, such as: • Short and simple “fact sheets”, documented by peer-review publications • Reports summarizing the activities undertaken for accomplishing the objectives of the task. • Presentations and peer-review publications -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  12. Leveranser, organisasjon og kostnader • Leveranser • a) REPORT #1- Workshop on recycling infrastructure in collaboration with PVCycle – • b) REPORT #2– Life Cycle Analysis standards for credible, well balanced and transparent studies • c) REPORT#3 -Workshop on Life Cycle Analysis / Benchmarking of the PV industry performance against other energy technologies • d) Fact Sheets summarizing the above • e) Incident data base for stakeholders (PV industry, insurance industry) • Organisasjon • Ikke avklart • Kostnader • Ikke avklart -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  13. Mulige resultater for industrien • Sikkerhets DB; Forebygge hendelser basert på industriens erfaring • Resirkulering; Infrastruktur for handtering - metodeutvikling • Benchmarking; Forbedre prosessens miljøprofil • Miljølabel; Kvalitetsstempel basert på utarbeidede retningslinjer - prosess • LCA; Bedre rammebetingelser for industrien basert på kunnskap om miljøgevinst ved valg av solceller til energileveranse. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm

  14. Konklusjoner • Task 12 vil bli iverksatt - endelig godkjenning 26-27 oktober. • Forutsetter at de enkelte medlemsland kan bidra med informasjon • Mål og delmål for task 12 er definert, og prosjektledere for 4 delprosjekter er utpekt. -CREATING FUTURE- Pioneering spirit Teamwork Accurate Enthusiasm