ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPMGestion Technique d’une Panne Majeure Mario Bätz CERNST-MO-TC
GTPM - Objectives • Improvement of collaboration and understanding PCR-TCR (roles & resp.) • Reduction of the SPS restart time after major breakdown • Monitoring documents for the SPS restart (logic of SPS restart, process description, instructions etc.) • A structured method, which can be generalized to future projects
Gestion Technique d’une Panne Majeure - GTPM • Control Room Representatives • PCR, TCR, MCR, (CRN) • Control specialists • ST/MO, SL/CO, SL/OP, ... • Equipment specialists • ST/EL, ST/CV, LHC/VAC, …
Accelerator Oriented Monitoring:Systems, Interaction & Data Electricity HT, MT, BT, Access Technical breakdowns GTPM • Major breakdown (alarms, logbooks,…) • System identification • System interdependency • Restart objectives • ... Water Pumping Stations, Raw, Prim, Chilled, Demi, ... Monitoring Hardware, Software, network ... Thermal Air-conditioning, Ventilation SL timing, power supplies, magnets, ... Vacuum Pumps, Pressures CPS
Monitoring System • Dynamic “restart diagrams” • UMMI’s in PVSS • Drivers for various data sources • TDS, electricity, vacuum, access, transfer lines, timing, power converters, ... • SAME tools in PCR,TCR, MCR,…
Added Value • All control rooms work with the same information • Breakdown impact at one glance-> faster situation assessment • Optimised restart strategy (priorities, order) • Shorter restart time • Visual system documentation for training
Outlook / next steps… • Use paper tools in operation this year • Assess improvement • Finish PVSS implementation • Formalise and document the method • MCR asked for same project shutdown2001/2002 and 2002/203 • Promote results and method for LHC operation