www.hinesmanagementservices.com. Capital Projects. JPMorganChase Data Center Houston, Texas. Significance. 1 of 5 critical nodes. 26-State ATM Operation. Mainframe operations - Texas. 24/7 Lockbox Operation. 24/7 Check Processing. LAN operations – Houston CBD campus. Problem:
E N D
www.hinesmanagementservices.com Capital Projects
JPMorganChase Data Center Houston, Texas
Significance 1 of 5 critical nodes 26-State ATM Operation Mainframe operations - Texas 24/7 Lockbox Operation 24/7 Check Processing LAN operations – Houston CBD campus
Problem: Isolation valves on condenser lines & chilled water lines reached the end of their useful lives. … and do it over a weekend. Owner’s Challenge: Change them out without shutting down the building’s air conditioning.
Friday Night Isolate the valves using fitted-collar, liquid-nitrogen, freeze technology.
Reroute the cooling to a 600-ton mobile auxiliary system (chillers, cooling tower, pumps & generator) rented for the weekend.
Note the freeze collar above the valve. Replace the valves.
Monday Morning All systems back to normal.