1 / 23

Proposal for LST-based IFR barrel upgrade

Proposal for LST-based IFR barrel upgrade. Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002. Outline. General Overview Layout geometry Performance Readout methodology Electronics Gas, HV, DAQ Costs Other presentations. General overview.

avari
Download Presentation

Proposal for LST-based IFR barrel upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for LST-basedIFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002

  2. Outline • General Overview • Layout geometry • Performance • Readout methodology • Electronics • Gas, HV, DAQ • Costs • Other presentations

  3. General overview • The entire project is driven by the allowed space • The intrinsic efficiency of a standard LST tube is about 90%. • This is due to dead spaces in the LST tubes. • Efficiency is too low for our purposes. Not enough space to put 2 standard layers.

  4. Possibilities to improve efficiency(given the allowed space) • Option 1: single-layer with a large cell (19x17 mm) Readout of x and y coordinates from outside strips

  5. Possibilities to improve efficiency • Option 2: double-layer with a small cell (9x8mm) Readout of x coordinate from wire and y coordinate from outside strips

  6. Possibilities to improve efficiency • Option 3: modified double-layer with a small cell (9x8mm) Readout of x and y coordinates from outside strips

  7. Detector layout: segmentation of a detector layer Z strip signal collection PCB PCB for cable connectors Z strip signal collection PCB Z strip readout Layer of LST Ф strip readout Ф strip signal collection PCB (a similar one in the opposite corner) PCB for cable connectors Servizio Elettronico INFN Ferrara

  8. Detector layout: details of strip signal collection PCB Servizio Meccanico INFN Ferrara

  9. Performance • Expected efficiency about 96% • Position resolution better than 3 mm (z) for standard LST better than 9 mm () We do not need such a resolution and we can increase the strip width, thus decreasing the number of channels (  MC simulation)

  10. Detector layout: questions • How many strips? • resolution, cost, space • How many chambers/layer ? • installation, cost

  11. Detector layout: answer to the questions • We are considering 4 cm z-strips and 4.3 cm -strips (2 -strips (along the wire)/LST tube) • 96 z-strips for each layer, total 6912 z-strips • 74 -stripsfor the outer layer, total 4572 -strips • About 11500 channels of electronics • 2 chambers/layer (remove only one corner block at the time), but the number of z-stripsdoubles (more cables, but same number of electronics channels) or we need to decouple z-strips from the chambers

  12. Readout methodology • Only digital readout of strips • Time measurements could be implemented: • OR of 16 discriminated pulses • Time resolution about 16 ns ( using BaBar reference clock) • Implemented with FPGA

  13. Electronics • FEC gain depends on the shape of the signal  FEC ampli cannot be used • Existing FEC: to be modified if we want to use them (when?)  the baseline is to use new electronics

  14. Front end module design : block diagram of the NEW 96 channel (1 view of 1 layer) FEC Threshold 96x Amplifier-Discriminator Cost per channel inclusive of: -components -PCB -crate&power supply 10 € / channel Servizio Elettronico INFN Ferrara 12us Digital OneShot 11us Digital OneShot 12us Digital OneShot 11us Digital OneShot 96 x 6 x Shift/Load Data Out 6 x Ck_Chain SHIFT REGISTER 6 x Shift/Load To the Active Patch Panel ahead of the FIFO Board Implemented in a single high performance FPGA (Field Programmable Gate Array)

  15. Front end module design : schematic of the front end based on Off-The-Shelf components Power dissipation: 250mW Servizio Elettronico INFN Ferrara

  16. Front end module design : analog simulations, effect of strip capacitance and impedance b) a) Simulation of the amplifier/discriminator output from a 4pC input signal (0.1mA * 40ns) Comparator threshold = 50mV dielectric thickness 0.75mm a) dielectric FOAM (εr=1) b) dielectric PTE (εr=3.3) c) dielectric FR4 (εr=4.8) c) Servizio Elettronico INFN Ferrara

  17. Gas system • mass flow control system • main gas transport pipe system (existing) • final gas distribution and bubbling system. We assume all the tubes in a layer with a single in/out • Safe gas mixture, like Ar/Iso/CO2 (2.5/9.5/88) (SLD)

  18. HV, DAQ • Each tube has a separate HV connection ( 2 for a double layer tube) • Possibility to use a commercial HV system for LST available from CAEN (SY546 mainframe + 12 channel boards A548), 150 $/channel • DAQ • No change, all signals are FEC-like

  19. Costs: assumptions • double layer LST with 8mm cells; each layer with a separate HV; each ground returning separately through a measuring resistor • 96 strips (40 mm strips) in the z direction; 2 strips per LST in the  direction • 2 chambers/layer (double the number of z strips signals) • 12 active layers

  20. Costs (I) • Tubes: • 30 K$ (setup) • 450 K$ ( about 200 $/tube x 2280 double layer tubes) Total cost tubes 480K$ (using single layer tube this cost would be about 300K$) • Strip readout planes 240 m2/layer x 6 layers x 50 $/m2 = 72 K$ Signal collection (PCB’s) inside iron 18 K$ Total cost readout planes 90 K$ • Grand total chambers 570K$ (double layers); 390K$ (single layers)

  21. Costs (II) • Total cost of signal flat cables 146 K$ (outside iron) 15 K$ (inside iron) • Total cost of signal flat cable connectors 28 K$ • Total cost of electronics 115 K$ • Service panels 4 K$ • Total cost of LV ground wire 5 K$ • Total cost of LV plugs 4K$ • TDC system 20K$ (optional) • Total electronics + cables 322 K$ (maximum); 171 K$ (minimum)

  22. Costs (III) • Total cost of HV wire 23 K$ • Total cost of HV banana plugs 9 K$ • Total cost of HV power supply+distributors 170 K$ • Total cost of mass flow control system 11 K$ • Total cost bubbling system 4 K$ • DAQ, cooling no expected cost • Total this page 217 K$ • Grand total detector 780 K$ 1100 K$

  23. Addressing the various issues • R&D issues and status Changguo Lu • LST experience and production issues Mario Posocco • Installation issues Livio Piemontese

More Related