Waterfront & Boating Access Summit Marina Projects October 14, 2006. Update on Current Projects . Major Structural Rehabilitation 5 th Dock Slip Expansion Courtesy Docks. Major Structural Rehabilitation. $6.3M Renovation Selected Areas: Decking Pilings Water Lines Electrical
E N D
Waterfront & Boating Access Summit Marina ProjectsOctober 14, 2006
Update on Current Projects • Major Structural Rehabilitation • 5th Dock Slip Expansion • Courtesy Docks
Major Structural Rehabilitation • $6.3M Renovation • Selected Areas: • Decking • Pilings • Water Lines • Electrical • Telephone • Cable • Completion Date: July 2007
5th Dock Slip Expansion • South Yacht Basin • Additional 52 Slips • Estimated Cost $3.3M • FDEP Permit w/Conditions • Water Quality Testing • Water Circulators • Storm Drain Interceptor • Estimated Completion Date: December 2007
Courtesy Docks • 18 Courtesy Slips • Replace 26 Existing Slips • Accommodate up to 27’ boats • 6 slips @ 24’ • 11 slips @ 27’ • 1 slip @ 40’ • First Phase Complete • Docking Fee
Courtesy Docks “Soft Opening”Interim Operating Procedures • Mooring of boats is allowed from 6:00 am until 2:00 am daily. • The docks are closed from 2:00 am until 6:00 am daily. • There are no overnight stays allowed at the Courtesy Docks. • The dock slips are numbered C-1 through C-8, with dock C-1 being the dock nearest Frescos. Dock C-1 can accommodate boats up to 40 feet in length. • Slips C-2 through C-6 can accommodate boats up to 27 feet in length.
Courtesy Docks “Soft Opening”Interim Operating Procedures • Slips C-7 and C-8 can accommodate boats up to 24 feet in length. • Boat length maximums shall not be exceeded, as this could create a hazard to navigation for all boaters involved in maneuvering in a restricted waterway. • The slips are for the use of the General Public. • These procedures are for the “soft opening” of the Courtesy Docks. These procedures will be replaced with permanent operating procedures within the next several weeks.