Waterfront & Boating Access Summit Marina Projects October 14, 2006

Waterfront & Boating Access Summit Marina Projects October 14, 2006. Update on Current Projects . Major Structural Rehabilitation 5 th Dock Slip Expansion Courtesy Docks. Major Structural Rehabilitation. $6.3M Renovation Selected Areas: Decking Pilings Water Lines Electrical

avari
Download Presentation

Waterfront & Boating Access Summit Marina Projects October 14, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waterfront & Boating Access Summit Marina ProjectsOctober 14, 2006

  2. Update on Current Projects • Major Structural Rehabilitation • 5th Dock Slip Expansion • Courtesy Docks

  3. Major Structural Rehabilitation • $6.3M Renovation • Selected Areas: • Decking • Pilings • Water Lines • Electrical • Telephone • Cable • Completion Date: July 2007

  4. 5th Dock Slip Expansion • South Yacht Basin • Additional 52 Slips • Estimated Cost $3.3M • FDEP Permit w/Conditions • Water Quality Testing • Water Circulators • Storm Drain Interceptor • Estimated Completion Date: December 2007

  5. Courtesy Docks • 18 Courtesy Slips • Replace 26 Existing Slips • Accommodate up to 27’ boats • 6 slips @ 24’ • 11 slips @ 27’ • 1 slip @ 40’ • First Phase Complete • Docking Fee

  6. First Phase – Courtesy Docks

  7. Courtesy Docks “Soft Opening”Interim Operating Procedures • Mooring of boats is allowed from 6:00 am until 2:00 am daily. • The docks are closed from 2:00 am until 6:00 am daily. • There are no overnight stays allowed at the Courtesy Docks. • The dock slips are numbered C-1 through C-8, with dock C-1 being the dock nearest Frescos. Dock C-1 can accommodate boats up to 40 feet in length. • Slips C-2 through C-6 can accommodate boats up to 27 feet in length.

  8. Courtesy Docks “Soft Opening”Interim Operating Procedures • Slips C-7 and C-8 can accommodate boats up to 24 feet in length. • Boat length maximums shall not be exceeded, as this could create a hazard to navigation for all boaters involved in maneuvering in a restricted waterway. • The slips are for the use of the General Public. • These procedures are for the “soft opening” of the Courtesy Docks. These procedures will be replaced with permanent operating procedures within the next several weeks.