General Issues. We will need to understand infrastructure requirements We will be providing a document to define the laboratory/experiment interface Possible locations at 4850 level Davis cavern (interference with LUX?) Drift adjacent to Yates shaft New excavation

avel
Download Presentation

General Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Issues • We will need to understand infrastructure requirements • We will be providing a document to define the laboratory/experiment interface • Possible locations at 4850 level • Davis cavern (interference with LUX?) • Drift adjacent to Yates shaft • New excavation • What are timing requirements?

  2. 4850L (+118m) Conceptual Layout, Plan View Lab Modules Existing Drifts Rhyolite Intrusions Yates Shaft Yates Unit Poorman Formation Neutrino Detectors Ross Shaft

  3. 4850L (+118m) Conceptual Layout, Plan View Existing Drifts Yates Shaft Muck Bays for Excavations (Future Lab Module Access) New Drifts at 4850L Lab Modules Neutrino Detectors 53m dia. x 45m vert. New Drifts at 5000L Ross Shaft

  4. 4850L (+118m) Conceptual Layout, Plan View Existing Drifts Yates Shaft Lab Module 2 20m horiz x 20m vert x 100m long Lab Module 1 20m x 20m x 50m long Neutrino Detector Access Drifts and User Area 20m horiz x 12m vert New Drifts at 5000L 6m horiz x 4m vert New Drifts at 4850L 6m horiz x 5m vert Ross Shaft

  5. Lab Module Concept with Water Shield Facility (WSF) 20m x 20m x 75m “D” Shaped Cavern Exit Drift Lab Module Cavern Entrance Drift

  6. Lab Module Concept with WSF, Cavern Back Removed (20m x 20m x 75m “D” Shaped Cavern) Water Tanks 12m dia. x 12m height Experiment Support Rooms Clean Room Transition Areas

  7. LUX Experiment with LBF Prep/Control Room LUX Experiment 4851.8L 4850L LBF 4874L

  8. Majorana Experiment at 4850L To Davis Lab Yates Shaft Area Cu Electro-Forming Waste Dump Ore Dump Majorana Experiment To Ross Shaft

  9. Majorana Experiment at 4850L, Plan View Assembly Clean Room (21 ft. x 16 ft.) Cu Electro-Forming Clean Room (79 ft. x 16 ft.) Clean Room Transition (14 ft. x 8 ft.) Machine Shop Clean Room (21ft. X 16 ft.) Clean Room Transition (13 ft. x 17.6 ft.) Clean Room ( 107 ft. x 8 ft.) To Ross Shaft Majorana Experiment