CONSTRUCTION PROJECTS DELAY

CONSTRUCTION PROJECTS DELAY. INTRODUCTION. Causes contribute to construction delay . Attitude of Contractor and Company. Agreement between Contractors and consultants  . D esign changes, poor labour productivity and inadequate planning. Effect of construction projects delay.

avian
Download Presentation

CONSTRUCTION PROJECTS DELAY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONSTRUCTION PROJECTS DELAY

  2. INTRODUCTION

  3. Causes contribute to construction delay • Attitude of Contractor and Company • Agreement between Contractors and consultants   • Design changes, poor labour productivity and inadequate planning

  4. Effect of construction projects delay • Time and cost overruns • Misunderstanding will occur between the client and contractor • A bad impression to clients

  5. How to Solve?? • A Programme or Project Evaluation & Review Technique (PERT) • Multi-agent System • Visual 4D planning and scheduling techniques

  6. Objectives Objectives

  7. To identify the factors contributing to the delay in constructions • To identify the main effects on owner as a result of the delay

  8. Research Questions…… • Distribute the questionnaire among civil engineering students, academic and non-academic staff. • 30 samples • 20 undergraduates students and 10 academic and non-academic staffs. • Analyse the result by using graph and chart.

  9. Data analysis

  10. Highest Frequency : Poor Scheduling • Second : Stoppages • Third :Lack of equipment • Less : Stop work orders and Inspection delays

  11. The highest frequency is incidences. • Material shortage, delays in material deliveries and delays due to interference with other crews shared same frequency. • Lowest frequency is site access.

  12. The highest choose by respondents is management factors • Followed by economy factors. • Third is environmental factors • Fourth is manpower factors. • Lowest is site factors.

  13. Effect toward the owner when construction delay • Highest percentage : Financial problem • Second : Increase interest • Third : Additional Professional Fees • Lowest : Loss of use

  14. Long Effect of construction delay • Highest percentage :Loss of trustworthy (47%) • Second :Loss of productivity(27%) • Disruption of building and bad signal to the foreign investors shared • same percentage (13%).

  15. Conclusion

  16. Our research conducted about construction projects delay which contribute to causes and factors. • There are some of the solutions to improve the construction delay . • Parties such as engineers , clients and contractors should count heavenly when a construction project to be delayed.

  17. Thank you