PROJECTS photovoltaic power plants in the FBiH. FNE planned installed capacity of 150 kWp in the Federation with the approved building permit. LICENSE. Previous electric power permit. Building permits. FNE KRUŠČIK, BANOVIĆI. BACKGROUND. Installed power: 150 kW
E N D
PROJECTS photovoltaic power plants in the FBiH FNE planned installed capacity of 150 kWp in the Federation with the approved building permit
LICENSE Previous electric power permit Building permits
BACKGROUND Installed power: 150 kW Location: Kruscik, Lancaster Project Owner: ELEKTROSAN d.o.o. Obtained DOCUMENTATION: Ownership of land Urban permit Previous up approval for Environmental permit Building permits inspection permit Started OIEiEK Connection to the network Expandable to 1 MWp
INVESTMENT INVESTMENT EXPENSES Approximately 220,000.00 Euro OWNERSHIP RELATIONSHIP 30% owner of the project 70% Investor Possibility of buying firms with project POSSIBILITY OF BUILDING - NOW RETURN OF INVESTMENT As an eligible producer by GUARANTEED tariffs (0.32 euro / kW) refund for a period of six years As a manufacturer's market at market price (0.40 euro / MW) refund for a period of 10 years.
CONTACT INFORMATION EKO-SAN D.O.O. SARAJEVO SAMIR HAMZIĆ Mail: samir.hamz@gmail.com Mob.: +387(0)63046970 / 061191872