An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AM 32kpat  128kpat Road Warrior SVT upgrade • SVT upgrade: • E’ parte dei DAQ upgrades per aumentare “Trigger bandwidths” • Tracce SVX only per migliorare il trigger di leptone inclusivo • DAQ upgrades a CDF: 6 M$ • Chi saremo – Schedule Paola Giannetti – Gruppo I Lecce - 24 settembre 2003

  2. SVT: Silicon Vertex Trigger XFT + SVX 4/4 (fino a 6/2003) XFT + SVX 4/5, more efficient Instead of XFT: • m 1<h<1.5 e 1<h<2.5 New Functionalities: m + SVX 4/5,1< h< 1.5 e + SVX 4/5, 1< h< 2.5 XFT tracks SVX hits

  3. I limiti ai rate dei tre livelli di trigger XFT (2227 k$) L2 (429 k$) SRC (Done) SVT (? K$) upgrade 350 Hz (L3-EVB) TDC (2132 k$) EVB (680 k$) L3 (631 k$) upgrade 15 kHz (L2 proc. Time) L1 Accept rate (Hz) L2 Accept rate (Hz) Time (sec) CSL (?k$) Offline (1M$) upgrade 70-80 Hz (L3-CSL) Dead Time L3 Accept rate 5% Time (sec)

  4. Accurate deadtime model (ModSim) to understand DAQ upgrades M. Schmidt • Two SRCs in parallel • L2 processor upgrade • 87 bit SVX digit. • -3 ms in SVT proc.time • cut SVT tails above 27 msec 4/4 DeadTime 20 kHz BUT the recent use of 4/5 in SVT changes the conditions! 5% 35 kHz L1A rate (kHz) 4/4 – 4/5 25 kHz • match piu’ debole • Ghost roads • 5 layers: Pattern + larghi 4/4 – 4/5 27 msec Time (ms)

  5. WHY 4/5? Signal Yields with 4/5 1430 D0 4/5 J/psi 970 D0 4/4 Marco RescignoCSL review 6/23/03

  6. Signal Yields in 4/5 Several studies: • D0 peaks in RUN 164303 (4/4) and 164304 (4/5) (Rolf) • EXPRESS_JPSI stream for 4/5 runs with svtsim emulation of 4/4 to get directly the yield increase of J/psi with both legs an SVT track • BGEN MC with realistic simulation of BsDsp(fp) p • Increase in signal yield match almost exactly the increase in L3 yield: S/B unchanged GAIN 50-60 % Marco RescignoCSL review 6/23/03

  7. NUOVA AM piu’ grande Hit Finders raw data from SVX front end Sequencer Associative Memory COT tracks fromXTRP x 12 phi sectors roads Road Warrior 12 fibers hits Track Fitter to Level 2 Merger hits Hit Buffer Tempi di processamento: come agisce l’upgrade? • Ricetta per velocizzare il tempo di esecuzione di SVT: • pattern piu’ sottili (AM grande)  menofits. • Road Warrior per rimuovere i ghosts

  8. 4/5 – 128kp – RW – All Annovi/Belforte Gli upgrade riportano la distribuzione dei tempi del 4/5 su quella del 4/4 ! 4/5 – upgraded 4/5 – 4/4 Detector Ghosts XFT svx

  9. SVT ha recentemente attivato il 4/5. Complessita’ e tempo di esecuzione sono aumentati. 4/5 Detector ghost 4.3 14.5 ROAD WARRIOR e AM ++ riportano il tempo di esecuzione a quello del 4/4 !

  10. Accurate deadtime model (ModSim) M. Schmidt 4/5+SVTupgrade  4/4 4/5+SVTupgrade+L2upgrade 4/5 now Ini_lum=44*1030 3 4/4 16 Ini_lum=32*1030 Ini_lum= 17.5 *1030 Ini_lum=22*1030 17kHz

  11. BMU Trigger di muoni in avanti (Annovi - Catastini – Cerri) 1<<1.25 (FRONT) L1 ora: BMU*BSU(F)*XFT11 rate 8-16Hz @ 4E31 L2: RateLimited @ 0.7 Hz 1.25<<1.5 (REAR) L1 ora: BMU*BSU(R)*TSU Rate 200-400Hz @ 4E31 L2: RateLimited @ 1.3 Hz 1<<1.25BSU(F) 1.25<<1.5 BSU(R) SVX TSU • Usiamo SVT*BMU*BSU per un unico trigger, senza bias in  ! Goal reiezione ~ 20-50. • leptoniprontidi alto Pt solo 30kpatterns 95% efficiente per Pt>8 GeV e d0<500m (ottima efficienza fino a 4 GeV). Implementiamo il 4/5.

  12. STUDIO del NUOVO TRIGGER • Qualita’ delle tracce SVX only: studio su dati e MC • Efficienza selezione L2: studio tagli su dati Z0 mm • Regezione del fondo: studio su dati selezionati da L1 ora

  13. J/Psi: MC vs SVT SVT: 2<10; |MCf0 – SVTf0|< 0.015 s(f)=0.007 sPt/Pt2=0.08 MCf-SVTf MCPt-SVTPt MCCRV-SVTCRV QUALITA’ delle tracce SVX only? Limit: s(f) = 0.002, sPt/Pt2 = 0.07 L1_MU data: offline vs SVT SVT 2<10; |offlf0 – SVTf0|<0.015 f(SVT)- f(offl) s(f)=0.008 f match h match Pt match f effic. h effic. Pt effic, sPt/Pt2=0.095 60% 60% 60% c(SVT)- c(offl)

  14. f0 offl vs fBMU fBMU–f0 offl (best) f0 SVT vs fBMU fBMU–f0 SVT (best) • matching cut Scegliamo il trigger di livello 2: quali tagli? fBMU–f0 offl Z0-> data : Pt>4 & 2<10 Z0 eff ~ 50% f0 offl vs fBMU fBMU–f0 offl (best) fBMU–f0 SVT (best) f0 SVT vs fBMU 5o Pt>4 & 2<10+|fBMU–f0 SVT|< 5O CUT fBMU–f0 SVT L1 MU data Per stimare la reiezione Reiezione fondo ~ 22

  15. Conclusioni • L’upgrade di SVT permettera’ un raddoppio della banda passante di L1 ed e’ parte fondamentale del DAQ upgrade. • L’uso di tracce SVX only permette un trigger inclusivo di muoni in avanti e di abbassare le soglie di trigger per gli elettroni nel plug.

  16. Pisa: Annovi dottorando (100%) Bardi ingegnere - art. 23 (100%) Dell’Orso prof. Associato (100%) Giannetti dirigente di ricerca (100%) Spinella assegnista INFN (50%) Ferrara: Damiani assegnista (10%) Sartori assegnista (50%) Tripiccione prof. Ordinario (10%) Cotta tecnologo (10%) Chiozzi tecnico (20%) “A Standard Cell based Content-Addressable Memory System for Pattern Recognition” A. Cisternino et al., CERN/LHCC/98-36

  17. TEMPI DI REALIZZAZIONE • Nuova AM-board: inizio estate 2004 (Pisa) • durante estate 2004: test con FPGA (Pisa) • Progetto prototipo AM-chip: luglio 2004 (Ferrara-Pisa) • consegna chip ~2 mesi – disponibile ad ottobre. • Nuova LAMB: montare nuovo AM-chip a ottobre 2004 (Pisa) • test del chip + scheda: ottobre – dicembre 2004 (Pisa-Ferrara) • produzione: inizio 2005 (Pisa-Ferrara) • installazione: estate 2005 (Pisa-Ferrara) • Altri DAQ/Trigger upgrade: previsti nel 2006 RUN Multiprojects di Europractice: nel 2003 tutti i mesi eccetto luglio e Dicembre http://www.europractice.imec.be/europractice/ Road Warrior: fattibilita’in Pulsar  S. Belforte (~60 k$ Fermilab) messa in opera entro fine 2003  F. Spinella

  18. Backup slides SVT backup slides

  19. Il tempo morto (< 5%) genera limiti alla banda passante dei 3 livelli • ………………. • L1 accept rate of 30kHz appears to be achievable • Two SRCs, 7-bit digitization • SVT improvements • L2 upgrade • L2 peak rate limited by Event-builder • Current limit ~350 Hz • EVB group: 450 is possible- TDC improvements coming • Will keep up at high luminosity • Level 3 Limitations • Input: CPU power ….. • Output: Logging Rate…… J. Lewis CDF CSL Review 23 June 2003

  20. Level 1 @Lum=40x1030 cm-2 sec-1 • Two Major Components • Calorimeter Triggers: Jets, electrons, photons, etc.~4-5 kHz In SVT: L1_JET10_&_SET90 (Higgs multijet) L1_TWO_TRK2_&_TWO_CJET5 (Zbb) L1_MET15_&_TWO_TRK2 (Higgs Z  nn) ~2 kHz L1_TWO_TRK10_DPHI20 (Di TAU exotic) L1_EM8 (Gamma + bjet) L1_CEM4_PT4 (B electron) L1_CMUP6_PT4 (B muon) • Hadronic B Decays: Two XFT tracks~11-12 kHz • Using three classes of B triggers • Scenario A • pT>2, pT,1+pT,2>5.5, opp. charge, Df<135°; DPS for safety only • Scenario C • pT>2.5, pT,1+pT,2>6.5, opp. charge, Df<135°; NO DPS • Low PT • pT>2, Df<90°; Heavy DPS, saturate bandwidth • Not considered for long-term J. Lewis CDF CSL Review 23 June 2003

  21. Level 2 Predictions XFT (2227 k$) L2 (429 k$) SRC (Done) SVT (? K$) upgrade TDC (2132 k$) EVB (680 k$) L3 (631 k$) upgrade CSL Bandwidth: Aggressive Trigger Model To stay below 21Mb/s Some physics losses With baseline cuts, saturate bandwidth at ~7e31 if 30 kHz allowed @L1 CSL (?k$) Offline (1M$) upgrade J. Lewis CDF CSL Review 23 June 2003

  22. Year chip boards devel. Total • 2003? 120 kE 10 kE (test b.) 5 kE 135 kE • - 10 kE (protot.) 30 kE 40 kE • 53 kE 40 kE (produc.) 60 kE 153 k • Ferrara Pisa • Road Warrior e’ pagato da USA: sottratti i • 35 kE corrispondenti nel 2005 (grazie Stefano!)

  23. Level 2 Operation • Approximate Timing Diagram Ready to load next event

  24. 6 electrical barrels Z 3D info from SVT • Due categorie di tracce SVT: • (Dz=0) Tracce che entrano escono dallo stesso barrel • Tracce che attraversano i barrel. Conosciamo il sengo di . • Una traccia SVT corrisponde ad una • traccia offline se Dz=0 oppure se Dz • ha lo stesso segno di .

  25. BSU DT1< Thr. DT2< Thr. L1 Trigger: (DT1< Thr. ORDT2< Thr.) AND BSU Camere dei MU (BMU) + scintillatori esterni (BSU)

  26. Come migliorare il fattore di reiezione per il trigger di m Migliorabile con semplici accorgimenti aggiuntivi: • Uso dell’informazione di hadron timing • Riduzione della finestra temporale per gli scintillari BSU e TSU • Usare il beam constraint per il track fitter • Migliora la risoluzione in Pt • Riduce il numero delle tracce false

  27. Z0 TRIGGER STUDY

  28. 0.9 0.9 0.8 0.7 5 GeV Higgs bb (mass = 110 GeV) Z0 ha efficienze minori (mass = 90 GeV)

  29. RUN IB Minimum Bias events

  30. 4/5 4/5 4/5 5/5 4/5 This road share all hits with the 5/5. It’s a ghost. These 3 roads share all hits. Two are ghosts. NOW pattern recognition with 5 SVX layers uses larger patterns w.r.t. 4 SVX layers More fakeroads and more hits inside roads Solution: More AM  thinner patterns  reduce fakes Why 4/5 is more complex? Ghosts are 60-70% of 4/5 roads. Removing them speeds up 4/5 processing time.

  31. Sorgenti di inefficienzaper m da Z0

  32. Super Pattern Super Bin Full Resolution Hits Road Road use most significant bits only Tracking in 2 steps: find Roads, then findTracks inside Roads

  33. The Event The Pattern Bank ... TRACKING WITH PATTERN MATCHING The Associative Memory (AM) • Dedicated device-maximum parallelism: • each pattern has its private hardware to • compare with the event. • Roads search during detector readout Bingo scorecard

  34. SVX only c2 distribution