80 likes | 199 Views
BNL Overview. DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson. BNL Overview. The state of the Lab: The CFN is in construction NSLS II preparing for CD1 RHIC II preparing for CD0 The state of HENP:
E N D
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson
BNL Overview • The state of the Lab: • The CFN is in construction • NSLS II preparing for CD1 • RHIC II preparing for CD0 • The state of HENP: • NP – its health is a key to a healthy HEP program! • RHIC is operating • EBIS is in construction • e-cooling R&D is under way • Detector upgrades are under way • HEP • You’re here to assess that…
Glossary • AARD – Advanced Accelerator R&D Group • ATF – Accelerator Test Facility • CFN – Center for Functional Nanomaterials • DETF – Dark Energy Task Force (HEPAP) • EBIS – Electron Beam Ion Source • FFAG – Fixed-focus Alternating Gradient • LSST – Large Synoptic Survey Telescope • NSLS II – National Synchrotron Light Source 3rd generation facility • NuSAG – Neutrino Science Assessment Group • QCDOC – Quantum Chromodynamics on a Chip • RHIC II – Relativistic Heavy Ion Collider luminosity upgrade project • RSVP – Rare Symmetry Violating Processes Project • SMD – Superconducting Magnet Division • VLBnO – Very Long Baseline Neutrino Oscillation Experiment • WFO – work for others
The state of HEP • Reorganized experimental groups post-RSVP • Collider physics • US-ATLAS, D0 • ILC Detector R&D (with Instrumentation Div.) • Fixed target & non-accelerator based physics • Neutrinos: MINOS, reactor q13, very long baseline • Cosmology, astrophysics: LSST • Strong theory & accelerator groups • High Energy Theory • Advanced Accelerator R&D (key to Muon Collaboration) • Accelerator Test Facility (HEP, BES) • Superconducting Magnet Division (NP, HEP, WFO) • Broad R&D programs • Accelerators: AARD, ATF, SMD • Detectors: ILC, LHC upgrade, astronomical (Physics, Instrumentation)
HEP Overview ~$28M/yr in Budget Authority • Physics: staff ~220, • HEP staff ~ 90, 60% ATLAS, 40% everything else • ATLAS, D0, Theory, MINOS, q13, VLBnO, LSST, ATF, AARD, ILC • Superconducting Magnet Division: staff ~ 50 • Accelerator and Magnet R&D: LARP, ILC • Instrumentation Division: staff ~ 50 (mostly Lab-funded) • ATLAS, ILC, LSST • Collider-Accelerator: staff ~ 370 (mostly NP-funded) • Neutrino R&D (with FNAL), AGS (if g-2)
ATLAS Staffing Research Program funding Travel funding Computing Infrastructure SMD Core competencies Survivability options ALD Review in June Theory Staffing LSST DETF P5 New research group Neutrinos Decision on Daya Bay Join VLBnO study w/ FNAL (g-2)m P5 Funding AARD HEPAP Subpanel R&D review ATF Staffing Current/near-term issues to focus on
Broader issues to focus on • Alignment with national goals • Health of current efforts • Viability of path forward • SMD is an important health & viability case • Right-sizing the BNL HEP effort • Balancing scientific vs. technical personnel • Balancing core effort vs. project effort
Final thoughts (until tomorrow) • Lots of material yet to be presented • Some of the important themes, especially in the experimental program are new since the last review • Keep in mind the broad issues • BNL (as well as DOE) can benefit from your opinion on whether this program makes sense as a package (as well as from detailed technical assessments)