1 / 11

RETRACK: an Integrated EU porject Ministry of Transport The Netherlands 15 July 2010, The Hague

RETRACK : Setting up an innovative rail freight service between North Sea and Black Sea REorganising of Transport networks by Advanced RAil freight Concepts. RETRACK: an Integrated EU porject Ministry of Transport The Netherlands 15 July 2010, The Hague Min Zhang, TNO Mobility & Logistics.

azizi
Download Presentation

RETRACK: an Integrated EU porject Ministry of Transport The Netherlands 15 July 2010, The Hague

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RETRACK: Setting up an innovative rail freight servicebetween North Sea and Black SeaREorganising of Transport networks by Advanced RAil freight Concepts RETRACK: an Integrated EU porject Ministry of Transport The Netherlands 15 July 2010, The Hague Min Zhang, TNO Mobility & Logistics

  2. Outline • Background and objective; Layout of corridor • Work activities • Pilot – Launching RETRACK Rail freight service • Future planning • End

  3. Background • FP6, Integrated Project, supported by DG MOVE/EC • Objective: develop, demonstrate, and implement innovative and market-proven rail freight service along NW-SE corridor, by a group of private railway companies emerged under the rail liberalisation wave. • Project duration: May 2007– Dec. 2012 • Consortium partners R&D; IT Consultancy Rail operator; Railway companies … …

  4. Rotterdam: • dry/liquid bulk • Maritime containers Duisburg: All cargo Ludwigshafen: (1) dry/liquid bulk • Bratislava/Kosice: • Steel/automotive Oradea, Constanta, All cargo Wels or Vienna: All cargo Budapest: All cargo Feeder point for Slovakia RETRACK corridor

  5. WP 1 WP 2 Logistics State - of - the - art requirements rail services WP 3 New rail freight service concept D i t s n s e e m m e i g n WP 7 WP 4 WP 5 WP 6 a a W 0 t n i P P IT Solution Training Rail infra & o a Rail safety & n 1 W m interoperability 1 security t c e j o r P WP 8 Pilot setup WP 10 WP 9 Synthesis & Evaluation reporting Work activities

  6. First demonstration launched 27/02/10

  7. Pilot status-quo Parties: TransPetrol: Rail operator Traction providerrs on main route: MWB: NL – Keulen – Passau LTE: Passau – Hegyeshalom CER: Hegyeshalom – Gyor : Gyor – xxx: ServTrans • Transported goods: • Automotives • Chemical, • Agri-bulk • Continental & maritime containers Rotterdam • Current challenges: • Extend service to RO • Infra. condition, charges in HU, RO. • High shunting costs • OSS not working Keulen Antwerp Passau Hegyeshalom Debrecen Orosháza Györ Hajduboszormeny • Train Characteristics: • 600 m in length • Up to 2.200 t (1800 ton) • Frequency: >1x/wk, more demand • Transit time: 21 hours (16 hours) Szabadegyhaza Constanta

  8. WP 1 WP 2 Logistics State - of - the - art requirements rail services WP 3 New rail freight service concept D i t s n s e e m m e i g n WP 7 WP 4 WP 5 WP 6 a a W 0 t n i P P IT Solution Training Rail infra & o a Rail safety & n 1 W m interoperability 1 security t c e j o r P WP 8 Pilot WP 10 WP 9 Synthesis & Evaluation reporting Future planning WP12 R. Knowledge Base WP13 Corridor extension

  9. WP12: RETRACK Knowledge Base • Five themes: • Traffic & Infrastructure; • Service & Biz modes; • Market condition; • Legislation & governance; • Knowledge • Transformation of findings, data, information into knowledge • Data and knowledge collected, assessed, presented on a corridor basis; dynamic thematic geo-map for geospatial data • Compatibility with work in TENTec, Transtools

  10. Trans - Syberian System Way from Asia KAZACHSTAN – WEST CHINA TRACECA Legend Main Retrack Route Land TRACECA Extension Sea TRACECA Extension Main TransSib Extension TransSib - Retrack Link Retrack South Europe Link Corridor connection points ( to be defined ) WP13: Corridor extension • Connect RU & CH via Eurasian land-bridges • Main reason: increasing dialogues • Objective: policy; potentials; feasibility

  11. RETRACK: Setting up an innovative rail freight servicebetween North Sea and Black SeaREorganising of Transport networks by Advanced RAil freight Concepts Min Zhang & Gerwin Zomer: Project Manager TNO Mobility & Logistics T: +31 15 269 6828 E: min.zhang@tno.nl; gerwin.zomer@tno.nl

More Related