LINAC4 TL Power Converters: From LT.BHZ01 to PSB

LINAC4 TL Power Converters: From LT.BHZ01 to PSB. 14/10/2010. Overview of TL (L4 to PSB). LT and LTB Lines. 27 circuits Power converters of BHZ20, 30 and 40 to be replaced Converters will be same as L4T H and V main bends Pulse form modified to permit field stabilisation

Download Presentation

LINAC4 TL Power Converters: From LT.BHZ01 to PSB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LINAC4 TL Power Converters:From LT.BHZ01 to PSB 14/10/2010 L4 to PSB Power Converters

  2. Overview of TL (L4 to PSB) L4 to PSB Power Converters

  3. LT and LTB Lines • 27 circuits • Power converters of BHZ20, 30 and 40 to be replaced • Converters will be same as L4T H and V main bends • Pulse form modified to permit field stabilisation • Slower rise time, longer flat-top • Magnetic field measurements during 2012 shutdown • To be decided if installation in 355 or 363 L4 to PSB Power Converters

  4. LBE and LBS Lines • 7 circuits • Magnets LBE.QFW10 and LBE.QDW20 will be upgraded • Existing circuits operate at ~10A • Replace power converters to operate at >95A • Requirements for LBS.BVT10 are currently undefined • Power converter should be replaced L4 to PSB Power Converters

  5. BI Line • 43 circuits • BI.BVT needs to be changed • Magnet will be changed • No details available yet • BI[1,2,3,4].DHZ50 • BI[1,2,3,4].DVT50 • BI[1,2,3,4].DHZ70 • BI[1,2,3,4].DVT70 • No details available yet • Existing power converters are OK up to 20A peak • Thus 17 Circuits are undefined L4 to PSB Power Converters

  6. BI line Modifications • The BI.SMH is not required for H- operation • BI.SMH and BI[1,2,4].SMV[old] systems will be removed • BI[1,2,4].SMV[new] systems will be installed in their place • The BI[1,2,3,4].BS chicane powering is a new requirement • 12kA nominal current with controlled 5ms ramp-down • Design not yet started • Between 10 and 15 new racks are required • Transformers to be integrated into the tunnel • The chicane induces perturbations in the PSB beam dynamics • Corrected by adding Qstrip trims to 2 sectors of each PSB ring • 10 new racks are required L4 to PSB Power Converters

  7. Space in 361 The following is proposed in 361-1-012 Install BI[1,2,3,4].BS Chicane (~15 racks) Remove SMH and SMV[1,2,4] Install new SMV[1,2,4] Remove DIS PB[1,2,3] (12 racks) Install PSB Qstrip Trims (10 racks) L4 to PSB Power Converters

  8. Conclusion • 130 power converter circuits between LINAC4 and PSB • More than 50% will be installed or modified for LINAC4 operation • Powering solutions for 18 Circuits are undefined • Waiting for magnet parameters • As they are undefined, no resource has yet been foreseen • Proposal for racks in 361-1-012 needs to be confirmed • Check access, cabling, power, etc • Integration studies required for BI[1,2,3,4].BS transformers • Use building 355 or 363 for the BHZ 20, 30 and 40 converters? L4 to PSB Power Converters