Contingency Operations. References:NAVFAC P-437, Planning Guide for Navy Facilities, Vol. 1NAVFAC P-437, Planning Guide for Navy Facilities, Vol. 2. Contingency Operations. NAVEDTRA 12543, Naval Construction Force/Seabee 1
E N D
2. Contingency Operations References:
NAVFAC P-437, Planning Guide for Navy Facilities, Vol. 1
NAVFAC P-437, Planning Guide for Navy Facilities, Vol. 2
3. Contingency Operations NAVEDTRA 12543, Naval Construction Force/Seabee 1 &C
Seabee Crew Leader Handbook
Seabee Construction Management I & II
4. Abbreviations MC = Total Manday Capability of Direct Labor Personnel (projects + training)
DL = Number of Direct Labor Personnel Assigned
WD = Number of Available Workdays in the Deployment
ME = Manday Equivalent (converts typical workdays to 8 hour mandays)
AF = Availability Factor
5. Manday Capability In order to calculate the construction activity duration's, you must first understand the Manday Capability Equation.
The equation used to determine the direct labor manday capability at the mainbody site and each detail site is as follows.
6. Manday Capability
7. Direct/Indirect/Overhead Labor Direct Labor personnel are those whose efforts contribute to project work-in-place (WIP).
Indirect labor personnel provide project support and include mechanics, expeditors, EAs (except when surveying), MLO / CTR, Staffs and the Ops / QC staff.
Overhead labor personnel provide battalion support such as disbursing, galley ops, personnel, admin and supply.
8. Workdays Workdays (WD) - The number of available workdays is the total number of calendar days minus all off days.
Off days may include: Sundays; half of the Saturdays; all holidays; battalion turnover (up to 10 days for mainbody); one day for mid-deployment party; and one day for the change of command.
9. Manday Equivalent Manday Equivalent (ME) - is the actual manhours worked swinging hammers on the job site during a workday. It is the length of the workday, minus lunch, minus breaks minus travel time to and from the job site (including lunch), divided by 8 (the number of hours in a manday).
10. Availability Factor Availability Factor (AF)- Takes into account that Seabees assigned as direct labor are not available 100% of the time.
About 20% of the direct labor personnels time is lost to : leave, liberty, inspections, quarters, medical, dental, haircuts, military drills, battalion indoc, watches, collateral duties, etc.
11. Availability Factor Availability Factors for planning purposes are provided by higher headquarters.
They vary between .60 and .90 depending on the deployment site.
The typical percentages are .75 for mainbody sites and .85 for detail sites.
The typical percentage for contingency construction is .90.
12. Example #1 How many Mandays of construction can a det with 60 direct labor personnel do in a deployment with 150 workdays, an availability factor of .80 and a manday equivalent of 1.125?
13. MC = DL x WD x ME x AF
MC = 60 x 150 x 1.125 x .80
MC = 8,100
14. Example #2 How many Direct Labor personnel would be required for a detail tasked to do 4,000 mandays in a deployment with 150 workdays?
Use 1.125 as the manday equivalent and .90 for the availability factor.
15. Answer #2 DL = MC / (WD x ME x AF)
DL = 4,000 / (150 x 1.125 x .90)
DL = 4,000 / 151.875
DL = 4,000 / 151.875 = 26.337 or 27
16. Example #3 How many Workdays would it take for 70 direct labor personnel to do 3,150 mandays of construction with an availability factor of .75 and a manday equivalent of 1.125?
17. Answer #3 WD = MD / (DL x ME x AF)
WD = 3,150 / (70 x 1.125 x .75)
WD = 3,150 / 59.0625
WD = 53.33 or 54
19. ME = WD - Travel time - break time -lunch / 8
ME = 10.5 - .167 - .33 - 1 / 8
ME = 1.125 Answer #4
20. Example #5 If a crew of 8 reported 125 mandays direct labor in a month with 21 workdays and a manday equivalent of 1.125, what was the actual Availability Factor?
21. Answer #5 AF = MD / (DL x WD x ME)
AF 1.125 IS FOR MAIN BODY ONLY
AF = 125 / (8 x 21 x 1.125)
AF = 125 / 189
AF = .6613756 or 66%
22. NAVFAC P-437 VOL 2INDEX OF COMPONETS
23. NAVFAC P-437 VOL 2COMPONETS
24. NAVFAC P-437 VOL 2FACILITIES
25. NAVFAC P-437 VOL 2ASSEMBLIES
26. SMEAC Situation
Mission
Execution
Administration
Command and control
27. SMEAC #1 Situation: Dayton peach accord requires deployment to NATO forces to Bosnia to which the United States has committed 5,000. Permanent and temporary campsites are required to house U.S. Forces.
Mission: Construct campsite to house JTF forces. Construct one (1) 750 man tent camp. Provide for repair of runway for C-130 aircraft. Convoy security will be provided by JTF as requested.
28. SMEAC #1 cont. Execution: Be prepared to deploy with in 5 days, advise ALCON when available for airlift. Provide specific airlift/sealift requirements to 2NCB within 48 hours. Identify Class IV materials required for camp construction within 72 hours. Upon completion of tasking, redeploy to originating site (approx. 60 days).
Administration: Operate own self-sufficient camp. Resupply requests through JTF. CESE support through own command, require anticipated schedule for airlift within fire days of arrival.
29. SMEAC #1 cont. Command and control:
OPCON - JTF
ADCON - NMCB 74
Advise ADCON on arrival
Revise schedule for construction and submit weekly sitrep.
30. NAVFAC P-437 VOL 2INDEX OF COMPONETS
31. NAVFAC P-437 VOL 2COMPONETS
32. CONVERT MANHOURS TO MANDAYS MD = MH / 8 hour in a workday
MD = 7,501 / 8
MD = 937.625 or 938
33. FORMULA FOR MANDAY CAPABILITY DL = MD / WD / ME / AF
DL = 938 / 56 (60 - 4 days for mount out) / 1.25 / .90
ME 1.25 is for contingency ops only
DL = 14.88 or 15
34. RATIO CM 6 TO 1
WILL BE CHANGING TO 8 TO 1 BUT IT HAS NOT GONE INTO EFFECT YET
HM 100 TO 1
IDC 150 TO 1
YN/PN 50 TO 1
MS 50 TO 1 LESS THEN 50 PEOPLE THERE WILL BE NO FSAS
35. RATIO cont. SK UNDER 100 THERE WILL BE ONLY 1
ET DEPENDS ON SMEAC
GM DEPENDS ON SMEAC
36. RATIO cont. FSA
FOR EVERY ONE MS THERE WILL BE ONLY ONE FSAS
1 TO 1
37. RRR 46 LEVEL I
20 LEVEL II
6 CRETE MOB.
TOTAL
72 PEOPLE
38. MAIN SUPPLY ROUTE MSR
6 EOs
FOR EVERY 10 MILES OF ROADS
39. SECURITY SECURITY PLT HAS 45 PEOPLE
PLT COMMANDER
ASST. PLT COMMANDER
RIGHT GUIDE
14 IN SQ
40. WATER WELL TOTAL OF 21 PEOPLE
OIC
MS
IDC
18 DL
41. THE END
ANY QUESTIONS