1 / 7

April 27, 2004

Getting from Proposals to Deals: The GE Experience in Kazakhstan. April 27, 2004. R. Michael Gadbaw Vice-President and Senior Counsel International Law & Policy General Electric. GE presence in Kazakhstan. GE International has been present in Kazakhstan since 1994.

baris
Download Presentation

April 27, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Getting from Proposals to Deals: The GE Experience in Kazakhstan April 27, 2004 R. Michael Gadbaw Vice-President and Senior Counsel International Law & Policy General Electric

  2. GE presence in Kazakhstan • GE International has been present in Kazakhstan since 1994. • GE history goes back even longer • first GE generators were delivered to Kazakhstan during the WWII • Today, with a regional liaison office in Almaty handling GE’s key business in Kazakhstan, Kyrgyzstan, and Uzbekistan, GE is actively pursuing projects in both public and private sectors in the region.

  3. Modernization: Success for Full Width TE10 Built GE Diesel-Electric Skid Starting Core Finished Locomotive Installed Skid

  4. GE Transportation Systems • Agreement with Kazakhstan Temir Zholy • 54 2TE-10 locomotive modernization kits: expanding locomotives life by 15-20 years • with US Export Import Bank and ABN Amro • Lessons Learned: • Listen to the customers • Financing is critical • Best technology fit at the best price

  5. GE Transportation Systems: Technology & Performance TE10 Mod. – MPS Performance • Fuel Consumption: 196 g/kWhr • 7% - 15% Improvement • Lube Oil Consumption: 0.2 – 0.4% • 80% Improvement • Adhesion: 24% Capability • 7.5% Improvement (Motor Limited) • MSA Maintenance Cost Reduction • 17% Cost Reduction • 1 Engine Overhaul / Life Extension • (2 Overhauls For Competition) • 13% Cost Reduction • Reliability: 2 FLY • 67% FLY Reduction

  6. GE Oil & Gas • KARACHAGANAK - KPO • FR6/B Generator • CC Gas Turbine • REC.COMPR. • Oil and Gas Coolers • 5Yrs O&M CSA ON NP FLEET;MAINTENANCE AGREEMENT ON N.9 BORSIG COMPR. AND N.2 KNOX WESTERN COMPRESSOR URALSK AND CIGA C.S. FR3 Generator KASHAGAN - KCO • FR5/D Generator • CC Gas Turbine • REC.COMPR. • Oil and Gas Coolers TENGIZ - TCO • FR5/D Generator • CC Gas Turbine • RECIPS.COMPR. • OIL AND GAS COOLERS • FR3 Generator + CC (Booster Compressor)

  7. Futureopportunities for GE Oil & Gas in the area • Tengiz Project expansion and Service Agreement • Kashagan Oil field development • Kashagan Service Agreement • Central Asia Gas Pipeline Refurbishment • Uralsk and CIGA FR3’s Modernization

More Related